HP2-Z37 Web TestEngine demo

Exit VCEDump HP2-Z37 Fast Track - Applying HP FlexNetwork Fundamentals
Question 18 of 18
0% complete
Q18 Single choice

An HP Provision switch has port A1 connected to port g1/0/1 of an HP Comware switch.

The ProVision port has the following configuration: vlan 1 untag A1 vlan 10 tag A1 vlan 20 tag A1 Which Comware configuration will allow the three VLANs to successfully pass traffic between the two switches?

Sign in to mark questions

Sign in to save marked questions and return to this demo.

Sign in