H13-531 Web TestEngine demo

Exit VCEDump H13-531 HCIE-Cloud Computing (Written) V2.0
Question 88 of 100
0% complete
Q88 Single choice

In the cloud migration business, it is planned to perform system migration on the Windows virtual machine
C drive through the Rainbow tool.

The block migration method uses fastcopy technology, which is faster and has a higher success rate than the file-level migration method. Therefore, the block migration method is selected.

Migrate Windows virtual machines.

Sign in to mark questions

Sign in to save marked questions and return to this demo.

Sign in