H11-828 Web TestEngine demo

Exit VCEDump H11-828 HCNP-UC(Fast Track)(Unified Communication (Fast Track))
Question 26 of 33
0% complete
Q26 Single choice

In a multi-node centralized network, there is a central node with a U1981 deployed, and two branch nodes, one with a U1911 and the other with a U1960. After a call from SIP user A under U1911 to SIP user B under U1960 is connected, the path along which the RTP streams are transmitted is ().

Sign in to mark questions

Sign in to save marked questions and return to this demo.

Sign in