  • Question 1281:

    If a worker encounters a production kanban at his/her workstation,the worker should

    A. Release the requested item to the next stage in the process.

    B. Begin manufacturing the requested item.

    C. Initiate a purchase order with the supplier of the requested item .

    D. Confirm the amount of the item requested and present the kanban to the production supervisor.

  • Question 1282:

    Just -in-time manufacturing practices are based in part on the belief that

    A. High inventory levels provide greater flexibility in production scheduling.

    B. Attempting to reduce inventory to a consistently low level can lead to "panic"situations.

    C. Goods should be"pulled"through the production process,not"pushed"

    D. Beefed-up internal control in the centrel warehouse can greatly enhance productivity in the production areas.

  • Question 1283:

    Key Co.changed from a traditional manufacturing operation with a job-order costing system to a just-intime operation with a backflush costing system.what is(are)the expected effect(s)of these changes on key'inspection costs and recording detail of costs tracked to jobs in process?

    A. Decrease Decrease

    B. Decrease Increase

    C. Increase Decrease

    D. Increase Increase

  • Question 1284:

    The effectiveness of a JIT system is often facilitated by the elimination of some commen forms of internal control.the elimination of which internal control is usually acceptable with a JIT system?

    A. Prepation of hard copy receiving reports.

    B. Voucher approval priot to paying accounts payable.

    C. Two signatures required on large cheaks.

    D. Locked doors on production areas.

  • Question 1285:

    In belk Co.'s just-in-time production system,costs per setup were reduced from $28 to $2.in the process of reducing inventory levels,belk found that there were fixed facility and administrative costs that previously had not been included in changes on belk's economic lot size and relevant costs?

    Lot size Relevant costs

    A. Decrease Increase

    B. Increase Decrease

    C. Increase Increase

    D. Decrease Decrease

  • Question 1286:

    A manufacturing company is attempting to implement a just-in-time(JIT)purchase policy system by negotiating with its primary suppliers to accept long-term purchase orders which result in more frequent deliveries of smaller quantiteies of raw materials.if the JIT purchase policy is successful in reducing the total inventory costs of the manufacturing company,which of the following combinations of cost changes would be most likely to occur?

    A. Purchasing costs Stockout costs

    B. Purchasing costs Quality costs

    C. Quality costs Ordering costs

    D. Stockout costs Carrying costs

  • Question 1287:

    Which changes in costs are most conducive to switching from a traditional inventory ordering system to a just-in-time ordering system?

    A. Increasing Increasing

    B. Decreasing Increasing

    C. Decreasing Decreasing

    D. Increasing Decreasing

  • Question 1288:

    Bell co.changed from a traditional manufacturing philosophy to a just-in-time philosophy.what are the expected effects of this change on bell's inventory turnover and inventory as a percentage of total assets reported on bell's balance sheet?

    A. Decrease Decrease

    B. Decrease Increase

    C. Increase Decrease

    D. Increase Increase

  • Question 1289:

    The benefits of a just-in-time system for raw materials usually include

    A. Elimination of nonvalue-adding operations

    B. Increase in the number of suppliers,thereby ensuring competitive bidding.

    C. Maximization of the standard delivery quality,thereby lessening the paperwork for each delivery.

    D. Decrease in the number of deliveries required to maintain production.

  • Question 1290:

    Companies that adopt just-in-time purchasing systems often experience

    A. A reduction in the number of suppliers.

    B. Fewer deliveries from suppliers.

    C. A greater need for inspection of good as the good arrive.

    D. Less need for linkage with a vendo's computerized order entry system.

Tips on How to Prepare for the Exams

Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only IMANET exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your IMANET-CMA exam preparations and IMANET certification application, do not hesitate to visit our Vcedump.com to find your solutions here.