    Which of these elements are not included in Implementation plans?

    A. Work breakdown structure

    B. Cost/Benefit ratios

    C. Risk management plans

    D. Planned audits of work completion

  • Question 172:

    Following the completion of a LSS project the Belt not only creates a Control Plan he also develops a _____________ so those involved in the process know what to do when the critical metrics move out of spec.

    A. Response Plan

    B. Call List

    C. Chain-of-Command

    D. Defect Analysis Plan

  • Question 173:

    If a process has subgroups for Variable data and the process runs for a long period of time, then the best pair of SPC Charts to use would be an Xbar and _________.

    A. NP Chart

    B. Individuals Chart

    C. R Chart

    D. C Chart

  • Question 174:

    If you can Poka-Yoke a defect out of the process entirely then you do not need use SPC on the characteristic of interest in the defect.

    A. True

    B. False

  • Question 175:

    Range Charts are the technique used to determine if ______________ are occurring within the subgroups of the SPC Charts.

    A. Common Causes

    B. Special inspections

    C. Unnatural forces

    D. Special Causes

  • Question 176:

    Control Charts were developed by Dr. Shewhart to track data over time. To detect Special Cause variation the Control Charts use which of these?

    A. Data shift analysis

    B. Outlier analysis methods

    C. Center Line and Control Limits

    D. None of the above

  • Question 177:

    If the production is for higher volume and monitoring and the Mean and variability is to be monitored for four machines producing product and the characteristic to be monitored is Variable Data, which SPC Chart is best to be selected?

    A. Xbar-R Chart

    B. Individual-MR Chart

    C. NP Chart

    D. CUSUM Chart

  • Question 178:

    Common and Special Cause ______________ are the focus of Statistical Process Control.

    A. Prediction

    B. Ideation

    C. Capability

    D. Variation

  • Question 179:

    Special Cause Variation falls into which two categories? (Note: There are 2 correct answers).

    A. Natural

    B. Short term

    C. Assignable

    D. Pattern

  • Question 180:

    SPC Charts are used extensively in different business and decision-making environments. In this example a vendor is being selected based on speed of delivery. Which of the conclusions would help you pick a vendor for your needs regarding lead-time of delivery from your vendors? (Note: There are 4 correct answers).

    A. Vendor A with a much shorter lead time in delivery

    B. Vendor B as it has a better consistency (lower variance) on lead time

    C. Vendor B since Vendor A shows a situation out of control as shown in red

    D. Vendor B since the Control Limits are much narrower than Vendor A

    E. Vendor B has higher lead time, but a process with much narrower Control Limits

Tips on How to Prepare for the Exams

Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only IASSC exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your IASSC-ICBB exam preparations and IASSC certification application, do not hesitate to visit our Vcedump.com to find your solutions here.