Exam Details

  • Exam Code
    :ICBB
  • Exam Name
    :IASSC Certified - Lean Six Sigma Black Belt
  • Certification
    :IASSC Certifications
  • Vendor
    :IASSC
  • Total Questions
    :424 Q&As
  • Last Updated
    :Jun 09, 2025

IASSC IASSC Certifications ICBB Questions & Answers

  • Question 411:

    Which statement(s) are correct about the Factorial Plot shown here? (Note: There are 3 correct answers).

    A. When the cutting speed increased from low to high level, the tool age increases

    B. The coefficient of the metal hardness is positively related to the output of tool age

    C. The coded coefficient is lower for cutting speed than the cutting angle related to the output of tool age

    D. These plots prove a statistically significance factor with 95% confidence

    E. These plots are an example of interaction plots

  • Question 412:

    Which of these elements are not included in Implementation plans?

    A. Work breakdown structure

    B. Risk management plans

    C. Cost/Benefit ratios

    D. Planned audits of work completion

  • Question 413:

    Upon completion and validation of an improvement to a process a Belt and the Project Team create a Control Plan that contains which of these?

    A. Standard operating work description of the process change

    B. Description of the monitoring system in place to assure continued compliance

    C. Summary of the targeted critical metrics for process performance measurement

    D. All of the above

  • Question 414:

    When a Belt Poka-Yoke's a defect out of the process entirely then she should track the activity with a robust SPC system on the characteristic of interest in the defect as an early warning system.

    A. True

    B. False

  • Question 415:

    Following the completion of a LSS project the Belt not only creates a Control Plan he also develops a _____________ so those involved in the process know what to do when the critical metrics move out of spec.

    A. Response Plan

    B. Call List

    C. Chain-of-Command

    D. Defect Analysis Plan

  • Question 416:

    The Control Limits width varies if the sample size varies for which type of chart?

    A. P Charts

    B. NP Charts

    C. Xbar-R Charts

    D. Time Series Charts

  • Question 417:

    If the production is for higher volume and monitoring and the Mean and variability is to be monitored for four machines producing product and the characteristic to be monitored is Variable Data, which SPC Chart is best to be selected?

    A. Xbar-R Chart

    B. Individual-MR Chart

    C. NP Chart

    D. CUSUM Chart

  • Question 418:

    Special Cause Variation falls into which two categories?

    A. Natural and Unnatural

    B. Short Term and Long Term

    C. Assignable and Pattern

    D. Attribute and Discreet

  • Question 419:

    Range Charts are the technique used to determine if Special Causes are occurring within the subgroups of the ______________.

    A. Histograms

    B. SPC Charts

    C. NP Charts

    D. Pareto Charts

  • Question 420:

    Control Charts were developed by Dr. Shewhart to track data over time. To detect Special Cause variation the Control Charts use which of these?

    A. Data shift analysis

    B. Outlier analysis methods

    C. Center Line and Control Limits

    D. None of the above

Tips on How to Prepare for the Exams

Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only IASSC exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your ICBB exam preparations and IASSC certification application, do not hesitate to visit our Vcedump.com to find your solutions here.