Which objects can affect the calculation of capacity requirements for an operation? (Choose three)
A. Standard values (routing)
B. Transport time (routing)
C. Operation control key (routing)
D. Formulas (work center)
E. In-house production time (material master)
Your customer tests the firming options for planned orders in SAP ECC using a test material. Therefore, the customer sets a firming date in the stock/requirements list manually. Additionally, the customer sets a planning time fence with firming type 1 in the material master.
How is the resulting firming interval specified in this scenario?
A. By the firming mechanism that spans further into the future.
B. By the manual firming date.
C. It is predefined in Customizing.
D. By the planning time fence from the material master.
Which activity can trigger an automatic availability check for the components of a production order?
A. Goods receipt for a missing part
B. Material staging
C. Order release
D. Order rescheduling
In the SAP ECC system, a material is produced using production orders. The planning table of repetitive manufacturing should be used to plan line loading for this material. On the initial screen of the planning table, you select this material and then receive a message informing you that you cannot use the planning table for this material (see attached screenshot).
What could be the reason?
A. The repetitive manufacturing indicator has not been set.
B. There are no requirements present.
C. There is no valid production version for this material.
D. There are no planned orders or production orders present.
In which master data object do you set the standard values for an operation?
A. Work Center
B. Production Resource/Tool (PRT)
C. Material Master
D. Routing
You maintained the planning strategy group 10 (make-to-stock production) in the material master (SAP ECC) of a material. For the coming months you have planned requirements with requirement type LSF (derived from the main strategy 10). Now, you want to change the requirement type from LSF to VSF (in accordance with planning strategy 40, planning with final assembly) for requirements in the existing production plan.
Which of the following statements are applicable in this case? (Choose two)
A. You can enter the strategy group 40 in the material master and change the present requirement for the product manually in the production plan.
B. You must change the requirement type for planning strategy 10 to VSF in Customizing. The requirement type for all existing requirements is then changed by the next planning run.
C. You can change the strategy group from 10 to 40 for the existing production plan in the material master, and the requirement type for all requirements is changed automatically.
D. You can enter the strategy group 40 in the material master, but the requirement type is not changed automatically for existing requirements.
When modeling in-house production using SAP ECC, on which business levels can you create a bill of material (BOM)? (Choose two)
A. At the client level
B. At the plant level
C. At the company code level
D. At the business area level
What could be a consequence of the confirmation of an operation?
A. Settlement of the actual costs
B. Reduction of capacity requirements
C. Rescheduling of the production order
D. Update of the planned costs
For which of the following objects can you enter a confirmation? (Choose two)
A. Production order
B. Production order operation
C. Trigger Point
D. Work Center
In SAP ECC, you calculate the standard available capacity for a work center capacity using the following data:
-Start: 7:00:00 a.m.
-End: 3:00:00 p.m.
-Break duration: 1 hour
-Rate of utilization: 80%
-Overload: 110%
-Number of individual capacities: 1
How large is the standard available capacity?
A. 7 hours
B. 6.16 hours
C. 5.6 hours
D. 8 hours
Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only SAP exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your C_TSCM42_65 exam preparations and SAP certification application, do not hesitate to visit our Vcedump.com to find your solutions here.