Which of the following statements regarding ATP checks in SAP ECC that are triggered from customer orders is correct?
A. An ATP check creates fixed links between customer orders and their confirmed receipts.
B. The ATP check does not take stocks and receipts into account. It checks consumption of planned independent requirements.
C. If the ATP check determines non-availability. It then checks in the next step whether it is possible to procure or produce in time.
D. The ATP quantity is the available quantity, which can be used to confirm incoming customer orders.
When maintaining a work center, formulas can be assigned in the scheduling view. Formulas use formula parameters for calculation.
What can be the origin of the formula parameters used for scheduling? (Choose three)
A. Standard values in the operations of routings
B. General operation values of routings
C. General values from work scheduling view of the material master
D. User-defined fields in the operation of routings
E. General item values of bill of materials
Where in the SAP ECC system can you define production versions?
A. In the bill of material
B. In the work center
C. In the material master
D. In the routing
Which issue can occur if the lot size-dependent in-house production time in the material master is not updated after changing the routing?
A. Lead time scheduling cannot take place.
B. Requirements planning creates an appropriate exception message in basic dates scheduling.
C. Subsequent capacity planning is no longer possible due to the obsolete scheduling parameters.
D. Dependent requirements request the components from the bill of materials at wrong times when using basic dates scheduling.
Which Customizing element controls the determination of planned costs in production orders?
A. Costing variant
B. Calculation procedure
C. Settlement profile
D. Accounting type
What can you use to organize material staging for production orders? (Choose three)
A. Transfer orders
B. Logistics Information System (LIS)
C. KANBAN
D. Material documents
E. Pull list
You use a planning time fence and fixing type 1. You receive a customer order with a material availability date within the planning time fence.
What do you have to consider in this scenario?
A. Planned orders that are created by requirements planning are shifted to the end of the planning time fence.
B. Requirements planning considers only changes that are relevant for scheduling within the planning time fence.
C. The MRP controller cannot create planned orders within the planning time fence.
D. Planned orders are created within the planning time fence and automatically firmed by requirements planning.
What master data do you need for material replenishment using the KANBAN procedure? (Choose two)
A. Production supply area
B. Product cost collector
C. Rate routing
D. Production version
E. Control cycle
Which of the following consequences result when a production order is set to Technically Complete (TECO)? (Choose three)
A. Confirmations are no longer permitted.
B. Reservations are no longer relevant for material requirements planning.
C. The order and its operations receive the system status Locked (LKD).
D. Capacity requirements are set to null.
E. The order is no longer relevant for material requirements planning.
Which of the following requirements is supported by using process orders?
A. Linkage of documents to orders
B. Use of reference operation sets
C. Use of production/resource tools
D. Documentation of the production using an electronic batch record
Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only SAP exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your C_TSCM42_65 exam preparations and SAP certification application, do not hesitate to visit our Vcedump.com to find your solutions here.