D-PSC-MN-01 Web TestEngine demo

Exit VCEDump D-PSC-MN-01 Dell GenAI Foundations Achievement
Question 8 of 16
0% complete
Q8 Single choice

A platform engineer is following the drive replacement procedure for a Dell EMC PowerScale Gen 6 node.
One of the steps is the removal of the sled containing the target drive.

What is the maximum time a sled can be removed from its slot before all drives in that sled are SmartFailed automatically?

Sign in to mark questions

Sign in to save marked questions and return to this demo.

Sign in