CCE-CCC Web TestEngine demo

Exit VCEDump CCE-CCC Certified Cost Consultant / Cost Engineer (AACE International)
Question 16 of 18
0% complete
Q16 Single choice

A major theme park is expanding the existing facility over a five-year period. The design phase will be completed one year after the contract is awarded. Major engineering drawings will be finalized two years

after the design contract is awarded and construction will begin three years after the award of the design contract. New, unique ride technology will be used and an estimate will need to be developed to identify these costs that have no historical data.

The following question requires your selection of CCC/CCE Scenario 26 (2.5.50.1.2) from the right side of your split screen, using the drop down menu, to reference during your response/choice of responses.

What information is needed to develop a Class 2 definitive estimate?

Sign in to mark questions

Sign in to save marked questions and return to this demo.

Sign in