300-615 Web TestEngine demo

Exit VCEDump 300-615 Troubleshooting Cisco Data Center Infrastructure (DCIT)
Question 12 of 45
0% complete
Q12 Single choice
Question 12 diagram

Refer to the exhibit. This configuration has been applied:
1. Eth1/5 and Eth1/7 as uplink ports and belong to port-channel 100
2. Eth1/6 and Eth1/12 as uplink ports and belong to port-channel 200

Two Cisco Nexus 9000 Series Switches, SW1 and SW2, fail to form a virtual port channel toward both fabric Two Cisco Nexus 9000 Series Switches, SW1 and SW2, fail to form a virtual port channel toward
both fabric interconnect switches.

Which set of ports must be allocated to which port channels to resolve the issue?

Sign in to mark questions

Sign in to save marked questions and return to this demo.

Sign in