Question 2 of 22
0% complete
Q2 Single choice

Scenario: A Citrix Engineer has already backed up the XenMobile configuration database. The following is a list, in no particular order, of some of the remaining steps that the engineer must complete to apply a patch to a multi-node, clustered XenMobile Server deployment:

1. Shut down the updated node.

2. Repeat the above steps for each node in the cluster until all nodes have been upgraded.

3. Fail over to secondary node.

4. Update the running node and confirm that the service is running.

5. Start the next node in the cluster.

6. Shut down all but one node.

7. Verify that all nodes are running in the cluster.

8. Update all nodes at the same time.

9. Restore the XenMobile configuration database.

Which six steps must the engineer take, and in which order do they need to be completed, to apply a patch to a multi-node, clustered XenMobile Server deployment?