What documentation is required to demonstrate compliance with Indoor Environmental Quality Credit, Daylight and Quality Views?
-
A
-
B
Lighting power calculations
-
C
Floor plans indicating regularly occupied spaces
-
D
Occupant satisfaction survey results
Reveal answer details
Close answer details
Correct answerC
ExplanationFloor plans identifying regularly occupied spaces are required to document daylight access and views. These drawings are used to verify compliance thresholds under the Daylight and Quality Views credit.
Which of the following scenarios contributes towards the achievement of Indoor Environmental Quality Credit, Daylight and Quality Views, Option 2. Quality Views?
-
A
A workstation with a skylight directly above
-
B
An office with windows that are completely covered by inoperable shades
-
C
A glass conference room with a view of office plants
-
D
An executive office with a view of a park
Reveal answer details
Close answer details
Correct answerD
ExplanationFor the Indoor Environmental Quality Credit, Daylight and Quality Views, Option 2. Quality Views, the scenario that contributes is having a view to the outdoors that provides a connection to the natural environment. An executive office with a view of a park meets this requirement by offering a direct line of sight to the outdoor environment, thus enhancing the occupants' psychological and emotional well-being. References: The LEED v4.1 O+M reference materials emphasize the importance of quality views to the outdoor environment for occupant comfort and well-being. In the scenario of achieving Indoor Environmental Quality Credit, Daylight and Quality Views, Option 2 (Quality Views), an executive office with a view of a park contributes towards this credit. This option focuses on providing building occupants with a connection to the natural outdoor environment by means of quality views, which include views of natural settings like parks, gardens, or other scenic vistas. References:LEED AP Operations + Maintenance Reference Guide, Indoor Environmental Quality section.
A project is pursuing Materials and Resources Credit, Solid Waste Management - Facility Maintenance and Renovation. The project has generated the following waste as part of their Facility Maintenance and Renovation activities: 2,000 lbs. (907.2 kg) of steel, 900 lbs. (408.2 kg) of carpet, 1,100 lbs. (498.9 kg) of wood, and 1,500 lbs. (680.4 kg) of wallboard. If the project has diverted 1,800 lbs. (816.4 kg) of steel, 900 lbs. (408.2 kg) of carpet, 1,000 lbs. (453.6 kg) of wood, and 250 lbs. (113.3 kg) of wallboard, what is the actual diversion rate achieved?
-
A
-
B
-
C
-
D
Reveal answer details
Close answer details
Correct answerB
ExplanationThe actual diversion rate is calculated by dividing the total weight of the diverted waste by the total weight of the generated waste. In this case, the project generated 2,000 lbs. ofsteel, 900 lbs. of carpet, 1,100 lbs. of wood, and 1,500 lbs. of wallboard, making a total of 5,500 lbs. of waste. The project diverted 1,800 lbs. of steel, 900 lbs. of carpet, 1,000 lbs. of wood, and 250 lbs. of wallboard, making a total of 3,950 lbs. of waste. Therefore, the actual diversion rate achieved is approximately 71.8%.
For Energy and Atmosphere Prerequisite, Building-Level Energy Metering, which energy sources must be metered at a minimum?
-
A
-
B
Electricity and natural gas only
-
C
All energy sources that serve the building
-
D
All end uses representing more than 10% of consumption
Reveal answer details
Close answer details
Correct answerC
ExplanationBuilding-Level Energy Metering requires that all energy sources serving the building, such as electricity, natural gas, district energy, or fuel oil, be metered. This prerequisite ensures comprehensive tracking of building energy consumption to support benchmarking and performance analysis.
Presuming all water fixtures meet the LEED Operations and Maintenance Rating System requirements, which of the following statements is correct when considering baseline water usage in relation to water use?
-
A
For a building with a certificate of occupancy dated 1993 or later, the baseline water usage is 120% of the water use
-
B
For a building with a certificate of occupancy dated 1995 or later, the baseline water usage is 120% of the water use
-
C
For a building with a certificate of occupancy dated 1993 or later, the baseline water usage is 150% of the water use
-
D
For a building with a certificate of occupancy dated 1995 or later, the baseline water usage is 150% of the water use
Reveal answer details
Close answer details
Correct answerC
ExplanationThe correct answer is C because the baseline water usage is 150% of the water use for a building with a certificate of occupancy dated 1993 or later, as stated in the LEED v4.1 O+M Reference Guide1.The baseline water usage is determined by calculating the estimated usage assuming Energy Policy Act-compliant fixtures 2. The other options are incorrect because they either have the wrong percentage or the wrong year for the baseline water usage. References: LEED v4.1 O+M Reference Guide, page 97 Guide to the LEED AP Operations and Maintenance (O+M) Exam, page 77 LEED v4 AP O+M Mock Exam, page 90
A project is ineligible for an ENERGY STAR?Rating and will document Energy and Atmosphere Prerequisite, Minimum Energy Performance by benchmarking against historical data. If the performance period calendar year is 2022, which of the following is an acceptable historical baseline?
-
A
Average of calendar years 2020 and 2021
-
B
Average of calendar years 2015, 2016 and 2017
-
C
Average of calendar years 2017, 2019 and 2021
-
D
Average of calendar years 2017, 2018 and 2019
Reveal answer details
Close answer details
Correct answerD
ExplanationThe correct answer is D because the historical baseline must be the average of the most recent three consecutive years of energy data available prior to the performance period 1. Since the performance period calendar year is 2022, the most recent three consecutive years of energy data available are 2017, 2018 and 2019. The other options are incorrect because they either include years that are not consecutive or not prior to the performance period. References: LEED v4.1 O+M Reference Guide, page 139 Guide to the LEED AP Operations and Maintenance (O+M) Exam, page 89 LEED v4 AP O+M Mock Exam, page 85 When a project is ineligible for an ENERGY STAR?Rating and opts to document Energy and Atmosphere Prerequisite, Minimum Energy Performance by benchmarking against historical data, the selected baseline must be representative of the building's typical performance. The average of calendar years 2017, 2018, and 2019 serves as a relevant baseline because it provides recent, consecutive annual data that reflects the building's energy performance before any significant changes or improvements made for LEED certification. This approach ensures that the performance period (in this case, the calendar year 2022) is compared against a stable and accurate representation of the building's typical energy use, allowing for a meaningful assessment of energy performance improvements. References:LEED v4 for Building Operations and Maintenance Guide, U.S. Green Building Council.
What information regarding a lamp is required to comply with Materials and Resources Credit, Purchasing - Lamps?
-
A
-
B
-
C
-
D
Reveal answer details
Close answer details
Correct answerA
ExplanationThe rated life of a lamp is required information for compliance with the Materials and Resources Credit, Purchasing - Lamps. This information ensures that the lamps purchased meet the longevity and performance criteria set by LEED standards. References: The LEED v4.1 O+M guide and related materials emphasize the importance of selecting lamps with a long rated life to reduce the frequency of replacements, thereby minimizing waste and resource use 123.
Which operational change can immediately reduce building energy consumption with minimal capital cost?
-
A
-
B
-
C
-
D
Reveal answer details
Close answer details
Correct answerC
ExplanationOptimizing operating schedules aligns equipment runtime with actual occupancy and demand, delivering immediate energy savings without major capital investment.
Which of the following strategies is most important for achieving economic and environmental performance in a LEED project?
-
A
-
B
Perform a full life-cycle assessment
-
C
Bring the project team together in the performance phase
-
D
Take an integrative approach
Reveal answer details
Close answer details
Correct answerD
ExplanationAn integrative approach is most important for achieving economic and environmental performance in a LEED project. This strategy involves collaboration among all stakeholders from the project's inception through its operation, ensuring that sustainability goals are woven into every aspect of the project. References: The integrative process is a fundamental principle of LEED, emphasizing the importance of early and continuous collaboration for sustainable design and construction.It is highlighted in the LEED v4 guidelines as a key to achieving high performance in both economic and environmental aspects. The most important strategy for achieving economic and environmental performance in a LEED project is to take an integrative approach. This approach involves collaborative, multidisciplinary teamwork from the project's inception through its operation. It emphasizes the importance of considering all aspects of building design, construction, and operation holistically to achieve sustainability goals effectively and efficiently.
Question 10
Single choice
A LEED AP is reviewing construction documents to identify the regularly occupied spaces on a project to ensure that floor area values are utilized consistently across credits. What aspects of each space should the LEED AP consider?
-
A
Rate of outdoor air provided per person
-
B
Fire ratings of installed wall and ceiling assemblies
-
C
Maximum number of intended occupants standing or seated
-
D
Typical duration of intended occupancy in each space per day
Reveal answer details
Close answer details
Correct answerC
ExplanationWhen identifying regularly occupied spaces in a project, the LEED AP should consider the maximum number of intended occupants, whether standing or seated, in each space. This is important for ensuring consistency in floor area values across various credits, such as those related to indoor environmental quality or space utilization. The consideration of occupants helps in determining space functionality and occupancy patterns, which are critical for accurate LEED assessments. References: LEED AP Operations + Maintenance Reference Guide, Indoor Environmental Quality section.
Question 11
Single choice
What is the diversion percentage of ongoing consumables in order to achieve exemplary performance as specified in Materials and Resources Credit, Solid Waste Management - Ongoing?
-
A
-
B
-
C
-
D
Reveal answer details
Close answer details
Correct answerD
ExplanationTo achieve exemplary performance in the Materials and Resources Credit, Solid Waste Management - Ongoing, a diversion percentage of 90% for ongoing consumables is required. This high level of diversion demonstrates an advanced commitment to reducing waste and promoting recycling and composting. By diverting 90% of ongoing consumables from the landfill, projects significantly contribute to sustainability goals by minimizing their environmental footprint related to waste. References: The LEED AP Operations + Maintenance reference guide specifies the criteria for exemplary performance in waste management, including the 90% diversion target. This ambitious goal underscores the importance of comprehensive waste reduction strategies in LEED-certified projects.
Question 12
Single choice
Which survey is required to document Indoor Environmental Quality Credit, Occupant Comfort Survey?
-
A
-
B
Thermal comfort and satisfaction survey
-
C
Transportation mode survey
-
D
Custodial effectiveness survey
Reveal answer details
Close answer details
Correct answerB
ExplanationThe Occupant Comfort Survey gathers feedback on thermal comfort, lighting, acoustics, and air quality to assess building performance from the occupants' perspective.
Question 13
Single choice
Landscape irrigation practices consume large quantities of potable water. By evaluating the project's outdoor water budget and irrigation water demand early in the Establishment Period in Water Efficiency Credit, Outdoor Water Use Reduction project teams will be able to
-
A
earn Water Efficiency Credit, Water Metering
-
B
earn Sustainable Sites Credit, Rainwater Management
-
C
determine water use in landscape designs
-
D
determine water use in outdoor fountains and pools
Reveal answer details
Close answer details
Correct answerC
ExplanationEvaluating the project's outdoor water budget and irrigation water demand early in the Establishment Period in Water Efficiency Credit, Outdoor Water Use Reduction allows projectteams to determine water use in landscape designs. This is because the outdoor water budget takes into account the water needs of the landscape, including plant types and climate conditions. By understanding this, teams can design landscapes that are water-efficient and meet the requirements for the Water Efficiency Credit. References: LEED v4: Building Operations + Maintenance Guide1, LEED v4.1 OPERATIONS AND MAINTENANCE - WAP Sustainability Consulting2
Question 14
Single choice
At a minimum, how often should a survey of building occupants be conducted about transportation patterns according to the Location and Transportation Credit, Alternative Transportation, Option 1?
-
A
-
B
-
C
-
D
Reveal answer details
Close answer details
Correct answerA
ExplanationThe LEED AP O+M V4.1 requires a survey of building occupants regarding transportation patterns to be conducted at a minimum every five years. This is to ensure that the data on alternative transportation usage remains current and accurate for the Location and Transportation Credit, Alternative Transportation, Option 1. References: The information is based on the LEED v4.1 O+M documentation and guidelines which outline the frequency of surveys related to transportation patterns.
Question 15
Single choice
For existing buildings pursuing LEED certification, the establishment period requirements include which of the following?
-
A
Cooling Tower Weekly Meter Readings
-
B
-
C
Alternative Transportation Survey
-
D
Reveal answer details
Close answer details
Correct answerB
ExplanationFor existing buildings pursuing LEED certification, the establishment period requirements include having a Site Management Policy. This policy is crucial for outlining the practices that will maintain the site sustainability over time. References: The LEED v4.1 O+M guide and additional resources emphasize the importance of a Site Management Policy as part of the establishment period requirements to ensure ongoing sustainability and compliance with LEED standards.
Question 16
Single choice
Which refrigerant was phased out due to the Montreal Protocol?
-
A
-
B
-
C
-
D
Reveal answer details
Close answer details
Correct answerA
ExplanationCFC-11 was phased out due to the Montreal Protocol because it is a chlorofluorocarbon (CFC) that contributes to ozone depletion. The protocol aimed to phase out substances with high ozone-depleting potential (ODP). References: The Montreal Protocol on Substances that Deplete the Ozone Layer is a global agreement that regulates the production and consumption of nearly 100 man-made chemicals referred to as ozone- depleting substances (ODS), including CFCs.
Question 17
Single choice
A project is using an on-site captured rainwater system and municipally treated wastewater for both flush fixtures and irrigation. To which of the following Water Efficiency prerequisites or credits can these alternative water sources be applied?
-
A
Both alternative water sources may only be applied towards the credits for both Indoor Water Use Reduction and Outdoor Water Use Reduction
-
B
Both alternative water sources may only be applied towards the prerequisites for both Indoor Water Use Reduction and Outdoor Water Use Reduction
-
C
The on-site captured rainwater may only be applied to Water Efficiency Prerequisite, Indoor Water Use Reduction while the municipally treated wastewater may only be applied to Water Efficiency Prerequisite, Outdoor Water Use Reduction
-
D
The on-site captured rainwater system may only be applied to Water Efficiency Credit, Indoor Water Use Reduction, while the municipally treated wastewater may only be applied to Water Efficiency Credit, Outdoor Water Use Reduction
Reveal answer details
Close answer details
Correct answerA
ExplanationUsing on-site captured rainwater and municipally treated wastewater for both flush fixtures and irrigation can be applied towards the credits for both Indoor Water Use Reduction and Outdoor Water Use Reduction in LEED. These alternative water sources contribute to the overall water efficiency of the project by reducing the reliance on potable water sources for indoor and outdoor uses.
Question 18
Single choice
Which of the following systems is typically excluded from scope under Energy and Atmosphere Credit, Existing Building Commissioning ? Implementation?
-
A
-
B
Domestic hot water systems
-
C
-
D
Reveal answer details
Close answer details
Correct answerC
ExplanationExisting Building Commissioning focuses on base building systems such as HVAC, lighting, and domestic hot water. Plug load equipment is generally excluded because it is tenant-controlled and not considered a base building system.
Question 19
Single choice
Cooling tower blowdown is necessary because
-
A
too much water in the system is inefficient so its water levels must be lowered
-
B
a buildup of dissolved solids increases conductivity which decreases efficiency
-
C
excess water treatment chemical levels corrode pipes and bleed-off reduces chemical levels
-
D
cold temperatures can freeze pipes if water is not moved and bleed-off prevents that from happening
Reveal answer details
Close answer details
Correct answerB
ExplanationLEED v4.1 O+M Reference Guide, p.1132: LEED v4 - U.S.Green Building Council( https://www.usgbc.org/ guide/om)3: What is Blowdown Loss in Cooling Towers?( https://deltacooling.com/resources/faqs/what-is-blowdown-loss-in-cooling-towers). Cooling tower blowdown is a process used to manage water quality in cooling systems. It involves discharging a portion of the water from the system to control the concentration of dissolved solids and minerals, which accumulate due to the continuous evaporation of water. These dissolved solids can increase the water's conductivity, leading to scale formation, corrosion, and biofouling, all of which can significantly decrease the efficiency and lifespan of the cooling system. By performing blowdown, the system maintains the water quality within acceptable limits, ensuring optimal performance and energy efficiency of the cooling tower. References: The need for cooling tower blowdown due to the accumulation of dissolved solids is discussed within the context of water management practices in cooling systems in the LEED AP O+M documentation. This process is crucial for maintaining system efficiency and is covered under the Water Efficiency category, emphasizing the importance of water management in achieving sustainable building operations.
Question 20
Single choice
Which activity satisfies the Establishment Period requirement for Sustainable Sites Credit, Site Management?
-
A
Conducting a one-time erosion control inspection
-
B
Developing and implementing a site management policy
-
C
Performing annual soil testing
-
D
Installing native vegetation
Reveal answer details
Close answer details
Correct answerB
ExplanationDuring the Establishment Period, projects must develop and implement a site management policy that addresses landscape maintenance, erosion control, and chemical use. This policy establishes consistent procedures to protect site ecology and meet Sustainable Sites Credit, Site Management requirements.
Question 21
Single choice
A standard reference when creating an indoor air quality management program is
-
A
Home Energy Rating System (HERS)
-
B
American Society of Heating, Refrigerating and Air - Conditioning Engineers 90.1 - 2010 (ASHRAE)
-
C
Chartered Institution of Building Services Engineers (CIBSE)
-
D
Indoor Air Quality Building Education and Assessment Model (I-BEAM)
Reveal answer details
Close answer details
Correct answerD
ExplanationThe Indoor Air Quality Building Education and Assessment Model (I-BEAM) is a comprehensive tool designed for use by building professionals and others interested in indoor air quality (IAQ) in commercial buildings. I-BEAM updates and expands EPA's Building Air Quality guidance and is designed to be comprehensive state-of-the-art guidance for managing IAQ in commercial buildings 1. This guidance was designed to be used by in-house staff to conduct a building investigation to identify indoor air problems and to enhance indoor air quality. References: LEED v4: Building Operations + Maintenance Guide
Question 22
Single choice
A building owner wishes to provide better Indoor Environmental Quality to the building occupants while containing capital costs. The LEED AP suggests pursuing Indoor Environmental Quality Credit, Enhanced Indoor Air Quality Strategies, Option 2. Filtration. However, the existing HVAC system was not designed to accommodate the required filters but is otherwise efficient and operating well. Which strategy would enable credit achievement?
-
A
Balance the existing HVAC system
-
B
Increase fan capacity to maintain air delivery despite the added resistance
-
C
Decrease fan capacity to maintain air delivery despite the added resistance
-
D
Replace the existing HVAC system with an air handler that can accommodate the filters
Reveal answer details
Close answer details
Correct answerD
ExplanationIn a scenario where the existing HVAC system was not designed to accommodate the required filters for Indoor Environmental Quality Credit, Enhanced Indoor Air Quality Strategies, Option 2, Filtration, but is otherwise efficient and operating well, replacing the existing HVAC system with an air handler that can accommodate the filters is a strategy to achieve credit. This option allows for the integration of higher efficiency filters without compromising the performance of the HVAC system.
Question 23
Single choice
Which of the following people are required to be listed on the LEED project registration page?
-
A
-
B
-
C
-
D
Reveal answer details
Close answer details
Correct answerA
ExplanationThe owner is the only person who is required to be listed on the LEED project registration page. The owner is the entity that has the authority to implement the LEED project and sign the certification agreement. The owner's representative, who can be a LEED AP or another person authorized by the owner, can register the project on behalf of the owner, but must also upload a confirmation of agent authority form. The primary architect, the commissioning agent, and other project team members are not required to be listed on the registration page, but can be added later as team members in LEED Online. References: Registering a project in LEED Online LEED AP O+M Candidate Handbook, page 7
Question 24
Single choice
Key functional and operational parameters such as occupied hours of a building, use by space type, required temperature settings, and lighting levels, are specified in the
-
A
-
B
-
C
Owner Project Requirements
-
D
Current Facility Requirements
Reveal answer details
Close answer details
Correct answerC
ExplanationThe Owner Project Requirements (OPR) is a document that details the ideas, concepts, and criteria determined by the owner to be important to the success of the project. It typically includes key functional and operational parameters such as occupied hours of a building, use by space type, required temperature settings, and lighting levels. The OPR is used as a guiding document throughout the design and construction process to ensure that the team is aligned with the owner's vision and goals. References: LEED v4: Building Operations + Maintenance Guide, Functional / Operational | WBDG - Whole Building Design Guide, Facilities Operations & Maintenance - An Overview - WBDG The Owner Project Requirements (OPR) is a critical document that outlines the functional and operational objectives of a project, reflecting the owner's needs and expectations. This document serves as a foundation for the design team to develop the Basis of Design (BOD) and guides the project through its lifecycle, ensuring that the owner's operational needs, such as occupied hours, use by space type, required temperature settings, and lighting levels, are met. The OPR typically includes information on building occupancy schedules, space usage types, environmental conditions like temperature and lighting requirements, and other owner-driven criteria essential for the building's design and operation. By clearly defining these parameters upfront, the OPR ensures that the project team has a clear understanding of what is expected from the building's performance, facilitating a design that aligns with the owner's vision and operational needs. Based on the LEED AP documents and resources, such as the ASHRAE 90.1-2013 User Manual, which provides guidelines for determining design and operational parameters like lighting wattage for various space types (ASHRAE 90.1-2013, Section 9.1.4) .
Question 25
Single choice
An equipment upgrade requires an initial investment of $1,500.00 USD with a total annual savings of $500.00 and a 33% rate of return. What is the Simple Payback Period for this improvement?
-
A
-
B
-
C
-
D
Reveal answer details
Close answer details
Correct answerC
ExplanationThe Simple Payback Period is the time it takes for an investment to pay for itself through savings. To calculate the Simple Payback Period, divide the initial investment by the annual savings. In this case, $1,500.00 USD divided by $500.00 equals 3. To find the exact payback period, consider the rate of return. With a 33% rate of return, the actual savings per year would be $500.00 plus 33% of $500.00, which equals $665.00. Dividing the initial investment of $1,500.00 by $665.00 gives a payback period of approximately 2.26 years, which is closest to two years. References: The concept of Simple Payback Period is a fundamental financial calculation discussed in the LEED AP O +M documentation. It is part of evaluating the cost-effectiveness of energy and water efficiency improvements, particularly under the Energyand Atmosphere and Water Efficiency categories. This metric is commonly used in sustainability projects to assess the viability of efficiency upgrades.
Question 26
Single choice
The Materials and Resources (MR) section includes which of the following building products in Credit calculations?
-
A
-
B
-
C
-
D
Reveal answer details
Close answer details
Correct answerA
ExplanationIn the Materials and Resources (MR) section of LEED, furniture is included in credit calculations, particularly in credits related to sustainable purchasing and waste management. Furniture plays a significant role in the environmental impact of a building's interior due to its material content, durability, and potential for reuse or recycling. Including furniture in MR calculations encourages the selection of sustainable products and practices, such as purchasing reused or recycled furniture, and implementing take-back programs or recycling initiatives at the end of the furniture's life cycle. References: This inclusion is outlined in the LEED AP Operations + Maintenance reference materials, where it details how furniture contributes to various MR credits, emphasizing the importance of sustainable purchasing decisions and waste management practices that encompass furniture.
Question 27
Single choice
Which practice supports compliance with Energy and Atmosphere Prerequisite, Energy Efficiency Best Management Practices?
-
A
Installing renewable energy systems
-
B
Performing ASHRAE Level 1 or 2 analysis
-
C
Purchasing carbon offsets
-
D
Upgrading all HVAC equipment
Reveal answer details
Close answer details
Correct answerB
ExplanationEnergy Efficiency Best Management Practices require an energy audit, such as an ASHRAE Level 1 or Level 2 analysis, to identify efficiency opportunities and guide operational improvements.
Question 28
Single choice
Rainwater harvesting can be used for which of the following credits or prerequisites?
-
A
Water Efficiency Credit, Water Metering
-
B
Water Efficiency Credit, Indoor Water Use Reduction
-
C
Water Efficiency Prerequisite, Indoor Water Use Reduction
-
D
Water Efficiency Prerequisite, Building-Level Water Metering
Reveal answer details
Close answer details
Correct answerB
ExplanationRainwater harvesting is a strategy that can be used to reduce indoor water use, which is a part of the Water Efficiency Credit under the LEED AP Operations + Maintenance (LEED AP O+M) V4.1. By collecting and using rainwater for non-potable uses such as toilet flushing or irrigation, buildings can significantly reduce their demand for municipally treated water. This aligns with the goals of the Indoor Water Use Reduction credit, which encourages the reduction of potable water usage inside the building. References: LEED v4: Building Operations + Maintenance Guide
Question 29
Single choice
When a building owner is deciding whether to execute an ASHRAE Level 2 audit or commissioning for Energy and Atmosphere Credit, Existing Building Commissioning -Analysis, which of the following statements most appropriately explains the difference between an ASHRAE Level 2 audit and commissioning of an existing building?
-
A
An ASHRAE Level 2 audit is required for newer buildings while commissioning is required for buildings in operation for more than five years
-
B
An ASHRAE Level 2 audit requires development of an energy use breakdown based on sub-metering while commissioning requires development of an energy use breakdown based on energy modeling
-
C
An ASHRAE Level 2 audit involves testing the operation of the systems against the sequences of operation while commissioning involves determining that the system operation meets the owner's current facility requirements
-
D
An ASHRAE Level 2 audit focuses on finding major upgrades to the building envelope or me-chanical, electrical, or controls systems while commissioning focuses on controls, proper sys-tem operations, and efficiency improvements
Reveal answer details
Close answer details
Correct answerC
ExplanationAn ASHRAE Level 2 audit focuses on a detailed analysis of the building's energy systems and their operation against predefined sequences of operation to identify energy conservation opportunities. It includes a thorough review of building energy use and a site survey to identify potential energy-saving measures. Commissioning of an existing building, on the other hand, is a more comprehensive process that involves verifying and documenting that all of the building's systems perform interactively according to the owner's current operational needs and the building's design intent. It often includes system testing, calibration, and adjustments to ensure optimal performance. References: The distinction between an ASHRAE Level 2 audit and commissioning is detailed in the Energy and Atmosphere section of the LEED O+M Reference Guide, emphasizing the different objectives and scope of these activities.
|