Huawei's career certification system is based on years of experience in ict talent training and understanding of industry development, based on the ict industry chain talent personal career development cycle, with levels of vocational and technical certification IP, IT, CT and ICT fusion technology certification system; the only ICT all-technology certification system.
-
A
-
B
Reveal answer details
Close answer details
Correct answerA
ExplanationThe statement is true because it describes Huawei's career certification system as covering IP, IT, CT, and ICT convergence across the ICT talent development cycle. That matches the stated all-technology certification positioning for ICT career development.
Question 2
Multiple choice
Data center L1 layer business deepening design goal (multiple choice)
-
A
On the basis of the summary audit plan (bidding plan), the needs of the owner are further clarified, and the boQ at the design plan level is refined, and the design depth reaches the construction drawing standard
-
B
Improve the design interface interface to ensure that the design of the respective systems of the project is consistent and coordinated with the professional design of architecture, structure, water, electricity, HVAC, decoration and other professions
-
C
Provide technical basis for the bidding of installation units (subcontracted construction units), equipment suppliers and project acceptance
-
D
Combined with the actual situation of the project, the work responsibility interface of Huawei (including tripartite purchased parts), subcontractors, and customers is determined, and the project purpose SOW (scope of work) and support determination RM (Responsibility)
Reveal answer details
Close answer details
Correct answersA, B, C, D
ExplanationL1 business deepening design refines owner requirements and the BOQ, aligns system interfaces with related building disciplines, supports bidding and acceptance, and clarifies SOW and responsibility boundaries among Huawei, subcontractors, and the customer. All listed goals belong to that design stage.
Question 3
Multiple choice
why data center L1 construction to do total integration (multiple choice)
-
A
20% shorter delivery times
-
B
Efficiency increased by N times
-
C
-
D
Reveal answer details
Close answer details
Correct answersA, B, C, D
ExplanationTotal integration for data center L1 construction is used because it improves the whole delivery cycle: delivery time can be shortened by 20%, efficiency can increase by multiple times, TCO can be saved by 10%, and integrated design plus delivery acceptance can be obtained together.
The total integration mode can be completed by one bidding.
-
A
-
B
Reveal answer details
Close answer details
Correct answerA
ExplanationTotal integration mode packages the integrated project responsibility under one overall engagement. Because the integration scope is handled as a whole, it can be completed through one bidding process instead of separate bids for each component.
Question 5
Multiple choice
What services are included in the performance management service? (Multiple choice)
-
A
-
B
Visual monitoring of performance
-
C
Fault demarcation and localization
-
D
Reveal answer details
Close answer details
Correct answersA, B, C
ExplanationPerformance management service includes reviewing user experience, visually monitoring performance, and helping demarcate and locate faults. Network optimization is a related follow-up service area, but it is not one of the listed performance management components here.
Huawei's enterprise product technology training takes the service life cycle as the design bus, and there are corresponding courses to meet the learning needs of students in three stages: planning, design, implementation, and operation.
-
A
-
B
Reveal answer details
Close answer details
Correct answerB
ExplanationThe statement is false because it says there are three stages but then lists planning, design, implementation, and operation, which are four life-cycle stages. That internal mismatch makes the description inaccurate.
data center L1 integration services of self-delivery and cooperative delivery is a combination of sales.
-
A
-
B
Reveal answer details
Close answer details
Correct answerA
ExplanationData center L1 integration can be sold through self-delivery, where the service team performs the work, and cooperative delivery, where delivery is combined with a partner. Because the service model permits both delivery modes in one sales approach, the statement is true.
What service content is not included in the data migration service?
-
A
-
B
-
C
-
D
Reveal answer details
Close answer details
Correct answerD
ExplanationData migration service content normally covers preparation and execution work such as information gathering, solution design, and migration implementation. Business issuance is an operational service launch activity, not part of the migration service content.
Question 9
Multiple choice
Where there are GRM-R network evaluation and optimization service opportunities:
-
A
-
B
Network interference is severe
-
C
The assessment indicators are not up to standard
-
D
Insufficient network coverage
-
E
Reveal answer details
Close answer details
Correct answersA, B, C, D
ExplanationGSM-R or eLTE evaluation and optimization is useful when a network is being newly built or when live operation reveals quality problems. Severe interference, indicators below target, and weak coverage are optimization scenarios. Hardware failure is a repair issue instead.
Question 10
Multiple choice
Huawei Data Center L1 Integration Project Implementation Quality Management Features (Multiple Choice)
-
A
Professionalization of construction personnel
-
B
Standard job implementation procedures
-
C
Support platforms help with implementation quality
-
D
High standards for complex engineering
Reveal answer details
Close answer details
Correct answersA, B, C, D
ExplanationL1 Integration implementation quality management covers both people and process controls: professional construction staff, standard job procedures, support platforms, and high engineering standards. Together they manage execution quality for complex data center integration work, so all listed features apply.
Question 11
Multiple choice
The data center L1 integration project feedback should contain (multiple choice)
-
A
Customer capital budget and construction time requirements
-
B
Customer relationship support, channel cooperation progress
-
C
-
D
Currently in the operational phase of the project
Reveal answer details
Close answer details
Correct answersA, B, C, D
ExplanationData center L1 integration feedback needs the full project picture: budget and schedule requirements, relationship and channel progress, competitor dynamics, and the current project phase. Each item helps qualify the opportunity and guide follow-up actions.
Question 12
Single choice
Which of the following services is not covered by on-site support services?
-
A
Replacement of spare parts on site
-
B
-
C
On-site software version upgrade implementation service
Reveal answer details
Close answer details
Correct answerC
ExplanationOn-site support focuses on field assistance such as troubleshooting and replacing spare parts at the customer site. Implementing a software version upgrade is a separate professional service activity, so it is not included in the basic on-site support scope.
Question 13
Multiple choice
The delivery level of spare parts first includes (multiple choice)
-
A
-
B
-
C
-
D
Original repair: 5x10x30CD
-
E
Reveal answer details
Close answer details
Correct answersA, B, C, E
ExplanationThe spare-parts delivery levels include Standard 7x10xND, Silver Medal 7x24xND, Gold 7x24x4H, and Platinum 7x24x2H. Original repair with 5x10x30CD describes a repair service commitment, not a spare-parts delivery level.
Question 14
Single choice
the data center L1 layer industry in the deepening design stage review content is correct.
-
A
-
B
-
C
Design standard specifications
-
D
Requirements confirmation document
Reveal answer details
Close answer details
Correct answerB
ExplanationDeepening design review checks whether the design has been developed into buildable technical documents. Construction drawings are the core deliverable at that stage, while tender files, standards, and requirement confirmation belong to procurement, reference, or earlier requirement work.
Question 15
Single choice
Huawei's enterprise technology host hotline in China is 400-822-9999.
-
A
-
B
Reveal answer details
Close answer details
Correct answerA
ExplanationThe statement is true because it identifies 400-822-9999 as Huawei's enterprise technology host hotline in China. This item tests recognition of that service contact number, so confirming the statement matches the required hotline information.
Question 16
Single choice
The corresponding functions of several commonly used tools in cloud computing are: HyperDP: Disaster Recovery, UltraLVR: Backup, DC Rainbow Migration.
-
A
-
B
Reveal answer details
Close answer details
Correct answerB
ExplanationA tool-mapping statement is true only when every product is matched to its proper function. Because this list contains an incorrect assignment among disaster recovery, backup, and migration tools, the combined statement should be marked false instead of partially accepted.
Question 17
Single choice
HUAWEI CLOUD service business model.
-
A
Cloud platform + operating costs
-
B
Cloud platform + operating costs + civil engineering
-
C
Cloud platform + operating cost + mechanical and electrical construction
-
D
Reveal answer details
Close answer details
Correct answerA
ExplanationThe cloud service business model is framed around providing the cloud platform and charging for its operation. Civil engineering or mechanical and electrical construction are project delivery costs, not part of the basic HUAWEI CLOUD service model named here.
Question 18
Single choice
One regional bank needs disaster recovery oversight that can show topology, monitor status, and support planned walkthroughs. Which capability should be positioned?
-
A
Standard classroom training delivery
-
B
Standalone warranty period calculation
-
C
Manual device quote discounting
-
D
Disaster recovery system management for an active-active solution
Reveal answer details
Close answer details
Correct answerD
ExplanationTopology visibility, status monitoring, and planned walkthroughs are disaster recovery management functions. For an active-active solution, disaster recovery system management gives oversight of the protected environment rather than training, warranty calculation, or quote discounting.
Question 19
Single choice
Huawei's service migration solution is divided into three main scenarios, which is the error? ()
-
A
-
B
Migrate between cloud platforms of other vendors
-
C
-
D
Internal migration of HUAWEI CLOUD platform
Reveal answer details
Close answer details
Correct answerB
ExplanationThe migration solution scenarios named here center on moving workloads into or within Huawei-related platforms, such as physical-to-virtual, virtual-to-virtual, and HUAWEI CLOUD internal migration. Migration only between other vendors' clouds is outside that set.
Question 20
Multiple choice
Agile data center planning and design and solution implementation service applicable scenarios (multiple choice)
-
A
All SDN network scenarios
-
B
Sell Agile Controller-DCN
-
C
Data center agile network scenarios
-
D
Sell Agile Controller-campus
Reveal answer details
Close answer details
Correct answersB, C
ExplanationAgile data center planning, design, and solution implementation services apply when Agile Controller-DCN is being sold and when the scenario is a data center agile network. Campus controller sales and all SDN scenarios are broader or different scopes.
Question 21
Multiple choice
the current situation of traditional professional subcontracting (multiple choice)
-
A
The subcontractors are independent of each other
-
B
The subcontractors are divided from each other
-
C
Customers need to communicate more
-
D
Reveal answer details
Close answer details
Correct answersA, B, C
ExplanationTraditional professional subcontracting separates work among different subcontractors. Each party often operates independently, responsibilities are divided, and the customer must coordinate more communication across groups. It is therefore not simple to manage.
Question 22
Multiple choice
What are the characteristics of disaster recovery system management in the active-active solution? (Multiple choice)
-
A
Visualize the disaster recovery topology
-
B
One-click disaster recovery switching
-
C
Flexible testing and walkthroughs
-
D
End-to-end disaster recovery monitoring
Reveal answer details
Close answer details
Correct answersA, B, C, D
ExplanationActive-active disaster recovery management needs visibility, controlled switching, safe testing, and continuous monitoring. Topology visualization, one-click switching, flexible walkthroughs, and end-to-end monitoring together support planned recovery and operational confidence.
Question 23
Multiple choice
GSM-R Evaluates and Optimizes the Value of Services:
-
A
Quickly improve network performance
-
B
Difficult problem analysis and positioning
-
C
Optimize safeguards in key areas
-
D
Transfer of knowledge and skills
-
E
Save on maintenance expenses
Reveal answer details
Close answer details
Correct answersA, B, C, D
ExplanationGSM-R evaluation and optimization covers direct service value: improving network performance, analyzing and locating difficult problems, strengthening safeguards in key areas, and transferring operational knowledge. Saving maintenance expense can be an indirect result, but it is not listed as a main value item here.
Question 24
Single choice
GSM-R evaluation and optimization service is for new incremental networks, and GSM-R evaluation and optimization services do not exist in GSM-R stock networks.
-
A
-
B
Reveal answer details
Close answer details
Correct answerB
ExplanationGSM-R evaluation and optimization is not limited to new incremental networks. Existing stock GSM-R networks also need evaluation and optimization to assess live performance and improve operation, so saying the service does not exist there is false.
Question 25
Multiple choice
What are the professional service products involved in the sale of the network scenario of the two places and three centers? (Multiple choice)
-
A
IP Network Planning and Design Services
-
B
IP Network Solution Implementation Services
-
C
IP network optimization services
-
D
Reveal answer details
Close answer details
Correct answersA, B, C, D
ExplanationA two-places, three-centers network sale needs the full service chain: planning and design defines the IP architecture, implementation delivers the solution, optimization tunes the running network, and Smart NOS adds the intelligent network operations service component.
Question 26
Single choice
IP network evaluation optimization service can be sold in scenarios that include friendly equipment.
-
A
-
B
Reveal answer details
Close answer details
Correct answerA
ExplanationIP network evaluation optimization can be sold when the customer environment includes friendly equipment. The service is concerned with evaluating and improving the IP network scenario, so it is not limited only to a narrowly defined single-vendor device replacement case.
Question 27
Multiple choice
The scope of work of the engineer's on-site service includes (multiple choice)
-
A
Weekly/monthly report on daily fault handling and operation
-
B
Problem tracking and upgrading and troubleshooting with Huawei TAC
-
C
Routine inspections and reports
-
D
Service customization and network optimization services
-
E
Equipment relocation services
Reveal answer details
Close answer details
Correct answersA, B, C
ExplanationOn-site engineering service covers recurring operational work: fault-handling reports, escalation or troubleshooting with Huawei TAC, and routine inspections with reports. Service customization, optimization projects, and equipment relocation are separate service activities beyond normal resident support.
Question 28
Multiple choice
What are the benefits of ITO to customers? (Multiple choice)
-
A
Transfer operational risks to service providers
-
B
Intensive, standardized O&M, and upgrading IT Infrastructure quality and performance
-
C
-
D
Cloud computing technology teams can get it quickly
Reveal answer details
Close answer details
Correct answersA, B, C, D
ExplanationITO benefits span risk, quality, cost, and staffing outcomes: operational risk can move to the service provider, standardized O&M can improve infrastructure performance, O&M costs can be controlled, and cloud computing teams can be obtained quickly.
Question 29
Single choice
Which of the following tools is mainly used in IP network evaluation and optimization services for information collection and evaluation?
-
A
-
B
-
C
-
D
Reveal answer details
Close answer details
Correct answerD
ExplanationuNetbuilder is the tool associated with IP network evaluation and optimization work, including collecting network information and supporting assessment. ENSP is mainly a simulation platform, while WLAN Planner is tied to wireless planning.
Question 30
Single choice
The service content provided by Huawei Hi-care Standard+ and Co-Care Standard Maintenance to end customers is the same, the difference is that the main body of Hi-care delivery is Huawei, Co-care Some services are delivered by a body of goods.
-
A
-
B
Reveal answer details
Close answer details
Correct answerA
ExplanationTrue matches the service distinction: Hi-Care Standard+ and Co-Care Standard Maintenance provide the same customer-facing maintenance content. The difference is delivery responsibility, with Hi-Care delivered by Huawei and Co-Care using the specified Co-Care delivery body for part of the service.
Question 31
Multiple choice
Which work products belong to IP network planning and design service for an architecture review? Choose two.
-
A
Requirements analysis and scenario modeling
-
B
On-site spare parts replacement record
-
C
Gap and risk analysis report
-
D
Student exam validity certificate
Reveal answer details
Close answer details
Correct answersA, C
ExplanationArchitecture review in IP network planning and design needs front-end analysis and risk findings. Requirements analysis with scenario modeling defines what the network must support, while a gap and risk analysis report identifies weaknesses to address.
Question 32
Single choice
Huawei has carried out an integrated design from planning, implementation, and evaluation to the training of ICT technology talents for industry customers, and only emphasizes the setting of clear learning goals and the formulation of overall talent development rights at the planning stage.
-
A
-
B
Reveal answer details
Close answer details
Correct answerB
ExplanationThe statement is false because an integrated ICT talent development design is not limited to clear learning goals and an overall plan at the planning stage. Planning, implementation, evaluation, and training form a broader lifecycle, so saying it only emphasizes those planning items is too narrow.
Question 33
Single choice
What are the service components that ip network planning and design service products do not include?
-
A
Target network planning and design
-
B
-
C
-
D
Reveal answer details
Close answer details
Correct answerD
ExplanationIP network planning and design is concerned with analyzing customer requirements, planning the target network, and preparing migration-oriented design. Implementation design belongs to the delivery and build stage, so it is outside the listed service components.
Question 34
Single choice
does not belong to the Internet industry data center computer room construction investment model is.
-
A
-
B
-
C
Reveal answer details
Close answer details
Correct answerC
ExplanationConstruction investment models are formal financing or delivery arrangements. Self-financing and BT are recognized project investment or build-transfer approaches, while crowdfunding is a public fundraising method and is not a standard IDC computer room construction investment model.
Question 35
Multiple choice
Which maintenance services include 2 times/year equipment health check service? (Multiple choice)
-
A
-
B
-
C
-
D
-
E
-
F
Reveal answer details
Close answer details
Correct answersD, E, F
ExplanationThe twice-per-year equipment health check belongs to the enhanced maintenance levels. Silver+, Gold+, and Platinum+ include that semiannual check service, while the base silver, gold, and Standard+ offerings do not match the two-times-per-year requirement.
Question 36
Single choice
Electronic information equipment shall be powered by ().
-
A
-
B
-
C
Reveal answer details
Close answer details
Correct answerA
ExplanationElectronic information equipment requires a stable, protected power source. A UPS provides backup and power conditioning during utility interruptions or fluctuations, making it the appropriate supply choice rather than generic electricity or a switching supply alone.
Question 37
Single choice
belongs to the data center L1 integration service interface is.
-
A
-
B
-
C
-
D
Reveal answer details
Close answer details
Correct answerB
ExplanationCivil is the data center L1 integration service interface because L1 integration concerns foundational site and construction interfaces. Land planning, electric, and communication belong to adjacent planning or system areas rather than the civil interface named here.
Question 38
Single choice
The highest level in Huawei's professional certification system is Huawei certiflcation lnternet Expert.
-
A
-
B
Reveal answer details
Close answer details
Correct answerA
ExplanationThe statement is true because Huawei's certification hierarchy culminates at the expert level. In that structure, the expert certification represents the highest professional tier above lower associate and professional levels.
Question 39
Single choice
Huawei's training services provide customers with "professional, practical, and time-effective" learning and development solutions; Huawei's training services are committed to letting learning promote the development of capabilities and letting capabilities develop promote the progress of enterprises.
-
A
-
B
Reveal answer details
Close answer details
Correct answerA
ExplanationTrue matches the stated training-service positioning. The description says the service provides professional, practical, and time-effective learning and development, with learning used to build capabilities and capability development used to help enterprises progress.
Question 40
Multiple choice
What are the following SDH network optimizations? (Multiple choice)
-
A
-
B
Business path optimization
-
C
-
D
Network clock synchronization optimization
-
E
Single board replacement optimization
Reveal answer details
Close answer details
Correct answersA, B, C, D
ExplanationSDH optimization can involve changing the network topology, improving service paths, optimizing ECC subnet communication, and correcting clock synchronization. Replacing a single board is a maintenance action, not a network-level optimization category.
Question 41
Single choice
During UniSTAR SCT service quotation, the generated service quote cannot be created from a submitted device quote because the BOQ may belong to another country, so what should be checked first?
-
A
Whether the BOQ country matches the current quotation country
-
B
Whether the classroom training schedule has been approved
-
C
Whether the service quote contains a decorative cover page
-
D
Whether the customer has changed the project nickname
Reveal answer details
Close answer details
Correct answerA
ExplanationA service quote tied to a device BOQ must use the correct country context. If the BOQ may belong to another country, the first check is whether the BOQ country matches the quotation country, since country mismatch can block quote generation.
Question 42
Multiple choice
What are the following scenarios where WLAN Planning and Design Services must be sold? (Multiple choice)
-
A
The number of APs is more than 300
-
B
High-density scenes (venues, exhibitions, etc.).
-
C
Railcar-ground communication project
-
D
Reveal answer details
Close answer details
Correct answersA, B, C, D
ExplanationWLAN Planning and Design Services are mandatory when project complexity or risk makes pre-sales design control necessary. More than 300 APs creates scale risk, high-density venues need capacity design, railcar-ground projects need mobility planning, and wireless city or safe city deployments need wide-area coordination.
Question 43
Single choice
As an important type of training course in Huawei's training and certification system, which category does advanced technical special training belong to in the corresponding service life cycle?
-
A
-
B
-
C
Implementation class training
-
D
Optimization class training
Reveal answer details
Close answer details
Correct answerD
ExplanationAdvanced technical special training aligns with optimization class training because it targets deeper technical improvement after basic planning, design, and implementation knowledge is in place. The service life cycle category is therefore focused on improving and optimizing capabilities.
Question 44
Single choice
IP planning and design services to provide global evolution center can provide several manufacturers of 1:1 simulation verification capabilities?
-
A
-
B
-
C
-
D
-
E
Reveal answer details
Close answer details
Correct answerC
ExplanationThe service capability being tested is the 1:1 simulation verification coverage provided by the global evolution center. Its stated coverage is 8 manufacturers, so the required numeric selection is 8, not the nearby counts such as 5, 9, or 10.
Question 45
Single choice
Which one is not included in the business migration assessment survey?
-
A
IT organizational structure
-
B
System performance parameters
-
C
-
D
Computer room environment
Reveal answer details
Close answer details
Correct answerD
ExplanationA business migration assessment focuses on the business and IT system being migrated, such as organizational structure, performance parameters, and system configuration. The computer room environment is facilities infrastructure, not part of the business migration assessment survey scope.
|