  • Question 251:

    A developer created a Robotic Enterprise (RE) Framework project in UiPath Studio 2021.10 with the default Config.xlsx settings. A Queue Item is processed and a Business Rule Exception is thrown. In addition, a System Exception is thrown

    in the SetTransactionStatus.xaml file when attempting to set the transaction status to "Failed".

    Based on the scenario, what is the behavior inside the REFramework if the System Exception persists?

    A. The Set Transaction Status activity is not retried
    B. The job is killed and the Queue Item is Abandoned
    C. The Set Transaction Status activity is retried up to 2 times
    D. A screenshot will be captured and moves to the next Queue Item

  • Question 252:

    A developer created a process with the Robotic Enterprise (RE) Framework, uploaded the package on the Orchestrator, and created a job for it. Once these steps are performed, the job is started from the Orchestrator and begins to process transactions. After two processed transactions, the job is stopped from Orchestrator.

    At which point in the workflow will this job stop?

    A. After the currently running workflow is executed because the stop command is propagated to the robot and the execution will be ended.
    B. Next time the Get Transaction Data state is executed, the stop command is detected and the execution transitions to the End Process state.
    C. Immediately, because the stop command is propagated to the robot and the execution will be ended.
    D. After the current transaction is finished, the Process Transaction state will detect the stop command and transitions to the End Process state.

  • Question 253:

    Based on best practice, in which file of the Robotic Enterprise (RE) Framework should any workflows using the Get Credential activity be invoked?

    A. KillAllProcesses.xaml
    B. InitAllApplications.xaml
    C. InitAllSettings.xaml
    D. GetTransactionData.xaml

  • Question 254:

    A developer needs to automate a process which involves capturing support ticket numbers from the email subject line. For example, the email subject line includes: "Action Required ?XA/13"; where";XA/13"; is the ticket number. The robot should validate the pattern of the ticket number before proceeding.

    Which expression exclusively matches the ticket number pattern from the subject line?

    A. Option A
    B. Option B
    C. Option C
    D. Option D

  • Question 255:

    What are the differences between a partial selector and a full selector?

    A. Partial selectors in activities always take longer to execute. Full selectors can contain wildcards.
    B. Partial selectors are recommended when switching between multiple windows. Full selectors can only contain one line.
    C. Partial selectors cannot contain wildcards. Full selectors always include the application name.
    D. Partial selectors can only be configured on activities inside containers. Full selectors always contain information about the top-level window.

  • Question 256:

    "Add Assets" in Orchestrator has the following option:

    A. Value Per Robot
    B. Value Per Process
    C. Single Value
    D. Value Per Environment

  • Question 257:

    What is the purpose of the WaitForReady property in any UiAutomation activity?

    A. Specifies to continue executing the remaining activities even if the current activity failed.
    B. Specifies the amount of time (in milliseconds) to wait for the activity to run before an error is thrown.
    C. Before performing the actions, waits for the target to become ready.

  • Question 258:

    A developer needs to ensure a UI element with a partially changing attribute can be consistently identified with a Click activity. Which property of the Click activity can support a wildcard?

    A. Element
    B. Selector
    C. ClippingRegion
    D. ClickType

  • Question 259:

    A developer has created the following sequence:

    The Write Cell activity has the following properties:

    What is the behavior of the sequence once executed?

    A. Writes the values in the same row in the Active Users.xlsx Excel file
    B. Writes the values in subsequent rows in the UserName datatable
    C. Writes the values in subsequent rows in the Active Users.xlsx Excel file
    D. Writes the values in the same row in the UserName datatable

  • Question 260:

    A developer creates a process using a State Machine. What section(s) does the Final State activity contain?

    A. Entry and Exit
    B. Entry
    C. Exit
    D. Entry, Exit and Transition(s)

Tips on How to Prepare for the Exams

Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only UiPath exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your UIPATH-ARDV1 exam preparations and UiPath certification application, do not hesitate to visit our Vcedump.com to find your solutions here.