Exam Details

  • Exam Code
    :ISTQB-TAE
  • Exam Name
    :ISTQB Certified Tester Advanced Level-Test Automation Engineering
  • Certification
    :BCS Certifications
  • Vendor
    :BCS
  • Total Questions
    :79 Q&As
  • Last Updated
    :Jun 06, 2025

BCS BCS Certifications ISTQB-TAE Questions & Answers

  • Question 41:

    Which of the following CORRECTLY describes how automation SHOULD be applied to confirmation testing?

    A. Confirmation tests are not good candidates for automation as they are not designed to run many times

    B. Confirmation tests should only be automated if they fail to pass on the first attempt

    C. Confirmation tests can be automated and incorporated into an automated regression suite to show whether defects that were previously fixed reoccur

    D. A confirmation test should only be automated after it has been run manually

  • Question 42:

    You are working as a TAE for a company who are re-designing their website. The new website provides information for customers and there are two minor features being developed:

    1) Request a newsletter

    2) Ability to contact the organisation with a question or comment

    The website must be "mobile friendly" and available on all major web browsers.

    You have been tasked to provide an automated solution for web browsers only and to concentrate on the two minor features.

    What would be a KEY challenge with automation in this context?

    A. A low level of intrusion is likely from use of existing UI elements, but depending on the solution this might be more complex than a higher level of intrusion.

    B. Because there is a high level of intrusion there may be many false alarms.

    C. Automation might not be possible on the mobile devices.

    D. The benefits of automation might not be achieved for many years due to the complexities of the SUT and automation solution.

  • Question 43:

    You are executing the first test run of a test automation suite of 200 tests. All the relevant information related to the state of the SUT and to the automated test execution is stored in a small database. During the Automated test run you observe that the first 10 test pass, while an abnormal termination occurs when executing the 11thtest. This test does not complete its execution and the overall execution of the suite is aborted. An immediate analysis of the abnormal termination is expected to be time consuming and you have been asked to produce a detailed report of the execution results for the first test run, as soon as possible.

    What is the MOST important FIRST step to be taken immediately after the abnormal occurred when executing the 11thtest?

    A. Re-run the test automation suite starting from the 12thtest

    B. Return the database to a consistent state that allows subsequent test to run

    C. Take a backup of the database in its current state. So It can be analyzed later

    D. Re-run the test automation suite starting from the 1sttest.

  • Question 44:

    In order to achieve re-use of a TAS, where SHOULD the design for reuse occur?

    A. At the code level

    B. At the framework level.

    C. At the TAS level

    D. At the TAA level

  • Question 45:

    Consider a TAS that exclusively uses the APIs of a SUT. To make this work, significant changes have been required to the SUT by adding a set of dedicated test interfaces to the APIs. All the automated tests will use these test interfaces when interacting with the SUT. Assume that you are currently verifying the correctness of the automated test environment and test tool setup.

    Which of the following would you expect to be the MOST specific risk associated with this scenario?

    A. The connectivity from the TAS to the dedicated test interfaces will not work

    B. The process of configuring the TAS will be error-phone due to manual intervention

    C. The automated test cases will not contain the expected result

    D. False alarms, that are unlikely to occur in the real world, will be observed during testing

  • Question 46:

    A major component of your organisation's Test Automaton Solution (TAS) is a popular open-source third-party capture-replay tool for automated functional testing.

    Which two of the following must the Test Automation Engineer (TAE) ensure happens for this TAS?

    a) The third party tool is placed under configuration management control.

    b) The annual support and maintenance costs are agreed with the tool's vendor.

    c) It is Important to obtain information about updates and new versions of the tool so that the third party tool is kept up to date.

    d) Ensure that the TAS test scripts are integrated into the tool's framework.

    e) Ensure that no changes are made to the tool, because modifications are not allowed for third party products.

    A. a and b

    B. c and d

    C. a and c

    D. d and e

  • Question 47:

    Your company is new to test automation and as TAE. you have designed a TAS which successfully supports the SUT for the current project.

    There are other systems currently in operation which have been tested manually and more systems are planned over the coming years. Based on this success, your company requires test automation be rolled out to other current and future

    SUTs with consistency being a key objective.

    Which of the following is the BEST way to achieve that?

    A. Design a new TAS for each SUT, and manage each one through a dedicated automation support team.

    B. Install the current TAS into a central repository so that other tests on different SUTs use the same version of the TAS.

    C. Check for correct connectivity to internal and external systems to ensure that the TAS has been installed and configured correctly for each SUT.

    D. Develop a tool that keeps track of automation failures across the different SUTs and produces regular reports to stakeholders.

  • Question 48:

    You have been asked to develop test automation for a legacy system that is going to go through a series of infrastructure migrations. The scripts will be used to verify basic functionality during these infrastructure changes Your Test Analysts

    have some programming skills and need a solution that is simple and fast.

    Maintainability of the scripts is not a consideration because no changes to the software are anticipated.

    Which of the following is the BEST scripting approach in this situation?

    A. Structured scripting

    B. Capture-replay scripting

    C. Model-Based scripting

    D. Linear scripting

  • Question 49:

    You are working on a web-based application called Book Vault that allows people to upload books and order books. This application must be available on all major browsers.

    You have been testing the application manually and management have asked you to consider automating some of the tests.

    You have investigated a number of commercial and free tools which can automate tests at a web browser level and one tool in particular meets your requirements and you have implemented a trial version.

    You have basic programming skills and the main goal is to automate a few functional tests to see if the tool is compatible with the application and can recognise the objects and controls.

    Which scripting technique would be MOST suitable in this scenario in order to meet the objectives?

    A. Structured scripting

    B. Capture-replay scripting

    C. Data-driven scripting

    D. Model-based scripting

  • Question 50:

    Designing the System Under Test (SUT) for testability is important for a good test automation approach and can also benefit manual test execution. Which of the following is NOT a consideration when designing for testability?

    A. Observability: The SUT needs to provide interface that give insight into the system.

    B. Re-useability: The code written for the SUT must be re-useable for other similar system.

    C. Clearly defined architecture: The SUT Architecture needs to provide clear and understandable interfaces giving control and visibility on all test levels.

    D. Control: the SUT needs to provide interfaces that can be used to perform actions on SUT.

Tips on How to Prepare for the Exams

Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only BCS exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your ISTQB-TAE exam preparations and BCS certification application, do not hesitate to visit our Vcedump.com to find your solutions here.