Exam Details

  • Exam Code
    :DES-6321
  • Exam Name
    :Specialist - Implementation Engineer - VxRail Appliance Exam
  • Certification
    :EMC Other Certification
  • Vendor
    :EMC
  • Total Questions
    :196 Q&As
  • Last Updated
    :Nov 14, 2021

EMC EMC Other Certification DES-6321 Questions & Answers

  • Question 11:

    During a VxRail 2 node Cluster deployment, what Is a valid connects option?

    A. 4 x 1 GbE

    B. 2 x 25 GbE

    C. 2 x 10 GbE

    D. 4 x 25 GbE

  • Question 12:

    Where are the vSAN logs stored?

    A. vCenter logs

    B. Standard ESXi host logs

    C. Master vSAN node

    D. vSAN appliance VM

  • Question 13:

    Which log bundles can be included in VxRail automated log collection used for troubleshooting?

    A. Mystic, Loudmouth and iDRAC

    B. VxRail, ESXi, and vCenter

    C. ESXi, Loudmouth and PTAgent

    D. VxRail, Mystic, and vCen

  • Question 14:

    You have been supplied a PEQ for a 4 7 xxx installation However, the spreadsheet VxRail version drop down menu only goes up to 4 5 xxx. What is a likely outcome it you continue using this PEQ?

    A. Cluster may be deployed at a lower code level

    B. An invalid Appliance JSON file may be generated

    C. The VMware vSAN license will be lost

    D. Cluster may require a RASR reset after deployment

  • Question 15:

    You are validating a VxRail deployment of six V570F nodes, each with four 10 Go connections. The VxRail nodes have not beer powered on. You need to ensure that the Dell EMC ToR switch is configured correctly. Which command should you use to do this?

    A. show interface status

    B. show port-channel summary

    C. show interface trunk

    D. show running-config

  • Question 16:

    What is the minimum number of VxRail nodes required for a vSAN storage policy with FTT = 2 an6 FTM set to Erasure Coding?

    A. 4

    B. 5

    C. 6

    D. 7

  • Question 17:

    What command is used to restart the Loudmouth process on a VxRail node?

    A. /etc/init d/loudmouth restart

    B. /usr/lib/vmware/loudmouth/bin/loudmouthd restart

    C. systemctl restart loudmouth

    D. systemctl restart vmware-loudmouth

  • Question 18:

    Beginning with VxRail version 4.7, which product license option has changed?

    A. Mware Log Insight

    B. vSAN

    C. vCenter

    D. vSphere

  • Question 19:

    A customer has three VxRail E560 nodes that have just been installed How many RP4VM licenses is the customer entitled to?

    A. 5

    B. 10

    C. 15

    D. 20

  • Question 20:

    You have just upgraded a VxRail Cluster from version 4.5.x to version 4.7.x You need to ensure that new VxRail 4 7 x nodes will be discovered without having to make any changes to the nodes. What action should you take on the existing configuration?

    A. Add a new VLAN to the ToR switches with ID 3939 In vCenter, set the VLAN ID of the VxRail Management distributed portgroup to 3939

    B. In vCenter, set the VI.AN ID of the Management Network distributed portgroup to 3939

    C. Add a new VLAN to the ToR switches with ID 3939 In vCenter, set the VLAN ID of the Management Network distributed portgroup to 3939

    D. Add a new VLAN to the ToR switches with ID 3939

Tips on How to Prepare for the Exams

Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only EMC exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your DES-6321 exam preparations and EMC certification application, do not hesitate to visit our Vcedump.com to find your solutions here.