Exam Details

  • Exam Code
    :CJE
  • Exam Name
    :Certified Jenkins Engineer (CJE)
  • Certification
    :CloudBees Certifications
  • Vendor
    :CloudBees
  • Total Questions
    :186 Q&As
  • Last Updated
    :Jul 14, 2025

CloudBees CloudBees Certifications CJE Questions & Answers

  • Question 131:

    Which is an invalid matrix-based security realm?

    A. Administer

    B. Run

    C. Slave

    D. Drive

  • Question 132:

    How do you configure the distribution of builds on each node?

    A. You configure it in the global configuration

    B. It happens largely automatically; although, you can configure the number of executors on a node.

    C. You configure it from "Configure System"

    D. You configure it from the project configuration

  • Question 133:

    What is Ant?

    A. A Java build tool

    B. None of these

    C. An acceptance testing platform

    D. A unit testing tool

  • Question 134:

    During a proposal, you need to quickly retrieve configuration for a demo of a project named "My Freestyle Project", which is in the "Freestyles" folder, in a neat and easily-readable XML format using a REST API call. What is the correct syntax for the call?

    A. http://:8080/job/My%20Freestyle%20Project/config.xml

    B. http://:8080/job/Freestyles/job/My%20Freestyle%20Project/config.xml

    C. http://:8080/job/Freestyles/job/My%20Freestyle%20Project/project.xml

    D. http://:8080/job/My%20Freestyle%20Project/project.xml

  • Question 135:

    Which is an invalid default project parameter?

    A. Boolean

    B. File

    C. String

    D. md5

  • Question 136:

    What's "Infrastructure as Code?"

    A. None of these

    B. Infrastructure is defined in source code, like the Jenkinsfile for a pipeline.

    C. There's no hardware

    D. Source code is hosted in your Infrastructure

  • Question 137:

    How can you trigger a downstream build?

    A. Both "Triggered by another project" and the "Parameterized Trigger Plugin"

    B. You could use the Parameterized Trigger Plugin to trigger from an upstream project.

    C. In the downstream build, you can select "Triggered by another project."

    D. Use the run() function passing the downstream projects name from within an upstream project build step.

  • Question 138:

    In a JUnit report, if we set the "Health report amplification factor" to 3 and there's a 10% failure, what's the health score?

    A. 98%

    B. 70%

    C. 75%

    D. 60%

  • Question 139:

    Which statements about a Distributed Version Control System are correct? Choose 2 answers

    A. It makes It easy to fork and merge code.

    B. It requires one server in each location.

    C. It requires a central server and a standby server.

    D. It requires fast network access for daily work.

    E. It operates without a central server.

  • Question 140:

    Freestyle job configurations provide a post-build action that allows you to build other projects after a build of this job. Which trigger conditions are supported? Choose 3 answers

    A. Trigger even if the build fails.

    B. Trigger only if the build succeeds during working hours.

    C. Trigger only if the build produces artifacts.

    D. Trigger only if the build succeeds.

    E. Trigger even if the build is unstable.

Tips on How to Prepare for the Exams

Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only CloudBees exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your CJE exam preparations and CloudBees certification application, do not hesitate to visit our Vcedump.com to find your solutions here.