A buyer runs a BIRT report which details Supplier Compliance. The buyer needs to further analyze the data in a spreadsheet to include an additional graph before reviewing the information with the manager.
Which process transforms the data?
A. Export
B. Preview
C. Application Export
D. Report Transformation
A workflow process has been revised and the new revision made active.
What happens to records that had already been routed into that workflow process before this was done?
A. They continue running in the earlier revision.
B. They are removed from workflow and must be restarted manually.
C. They switch to running in the new revision as that is the only active revision.
D. They are removed from workflow and are started in the new revision by a cron task.
Which statement is true about routes?
A. A route can only be applied to a work order by a PM.
B. A route's sequence numbers are fixed after it is activated.
C. A route can create work orders for locations or assets, not both.
D. Route Stops that become work order tasks cannot have job plans.
To minimize Start Center load times, end users can see detailed KPI information from which application?
A. Analytics
B. KPI Viewer
C. KPI Manager
D. KPI Templates
A store manager needs to make changes to an asset via the Move/Modify action. Which of the following changes can be made? (Choose two.)
A. Features
B. Storeroom
C. Asset's location
D. Class description
E. Parent/child relationship
A company is using Process Flow Control and wants to change the default values for Flow Start and Flow Complete statuses.
Where can these values be configured?
A. System Properties
B. Work Type settings
C. WOSTATUS Domain
D. Change Work Order Options action
A company wants to trigger a PM based on a characteristic type meter. How can this be accomplished?
A. Create a master PM and link to the characteristic on the Related Records tab.
B. Create a condition monitoring point and specify the PM on the upper or lower limit.
C. Create a PM against the asset and specify the meter on the Frequency tab of the PM.
D. Create an escalation based on the characteristic meter and trigger the PM via an action.
A forecast has been made for a PM. The decision has been made to delete that forecast. In which case is the forecast blocked from being deleted?
A. A reforecast is pending.
B. The forecast dates are unlocked.
C. A forecast can always be deleted.
D. The forecast dates have been locked.
An administrator has a requirement to update the address of all company records associated with a certain vendor.
How can this be achieved?
A. Update the company set with the new address.
B. Update the vendor record and select Update Related Vendors?.
C. Update the company template and check the checkbox Roll Down?.
D. Update the company master record and check the checkbox Update Related Companies?.
A planner needs to combine a number of items to be used regularly that can be tracked by a single item number and issued to work orders. How can this be achieved?
A. Using an item assembly structure.
B. Transferring the necessary items to a single bin.
C. Changing the item number of each included item.
D. Updating the physical count of the inventory record.
Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only IBM exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your C2010-555 exam preparations and IBM certification application, do not hesitate to visit our Vcedump.com to find your solutions here.