  • Question 1:

    Considerable attention will be given in this project to defining exit criteria and on reporting back on their status. Which combination of TWO exit criteria from the list would be best to use?

    I. Total number of defects found

    II. Percentage of test cases executed

    III. Total test effort planned versus total actual test effort spent

    IV.

    Defect trend (number of defects found per test run over time

    A.

    (i) and (ii)

    B.

    (i) and (iv)

    C.

    (ii) and (iii)

    D.

    (ii) and (iv)

  • Question 2:

    A test log is one of the documents that need to be produced in this domain in order to provide evidence of testing. However, the level of detail of test logs can vary. Which of the following is NOT an influencing factor for the level of detail of the test logs being produced?

    A. Level of test execution automation

    B. Test level

    C. Regulatory requirements

    D. Experience level of testers

  • Question 3:

    Explain how the above mentioned report may differ from a report that you produce for the project manager, who is a test specialist Select TWO items from the following options that can be used to report to the project manager and would not be included in a report to senior management.

    A. Show details on effort spent

    B. List of all outstanding defects with their priority and severity

    C. Give product risk status

    D. Show trend analysis

    E. State recommendations for release

  • Question 4:

    Consider the typical objectives of testing. Which of the following metrics can be used to measure the effectiveness of the testing process in achieving one of those objectives?

    A. Average number of days between defect discovery and resolution

    B. Percentage of requirements covered

    C. Lines of code written per developer per day

    D. Percentage of test effort spent on regression testing

  • Question 5:

    You have been given responsibility for the non-functional testing of a safety-critical monitoring and diagnostics package in the medical area.

    Which of the following would you least expect to see addressed in the test plan?

    A. Availability

    B. Safety

    C. Portability

    D. Reliability

  • Question 6:

    Since the system is in the medical domain and therefore in the safety critical area, testing needs to be rigorous and evidence is required that the system has been adequately tested. Identify THREE measures that would typically be part of the test approach in this domain and which are not always applicable in other domains!

    A. High level of documentation

    B. Failure Mode and Effect Analysis (FMEA) sessions

    C. Traceability to requirements

    D. Non-functional testing

    E. Master test planning

    F. Test design techniques

    G. Reviews

  • Question 7:

    IEEE 1028 also defines "management review" as a type of review.

    What is the main purpose of a management review?

    A. Align technical concepts during the design phase

    B. Establish a common understanding of requirements

    C. Provide independent evaluation of compliance to processes, regulations, standards etc.

    D. To monitor progress, assess the status of a project, and make decisions about future actions

  • Question 8:

    Which of the following is an example of testing as part of the requirements specification phase?

    A. A requirements review meeting

    B. A business analyst eliciting requirements

    C. Performing acceptance tests against requirements

    D. A test report showing requirements coverage

  • Question 9:

    You are about to release a test progress report to a senior manager, who is not a test specialist. Which of the following topics should NOT be included in the test progress report?

    A. Product risks which have been mitigated and those which are outstanding.

    B. Recommendations for taking controlling actions

    C. Status compared against the started exit criteria

    D. Detailed overview of the risk-based test approach being used to ensure the exit criteria to be achieved

  • Question 10:

    Select THREE issues from the options provided that should at least be raised.

    A. Has there been sufficient comparison of tools?

    B. What are the problems we are trying to address?

    C. Do we have a set of tool requirements to validate the tool against?

    D. How will the implementation be organized?

    E. Which project will be selected to perform the tool pilot?

    F. Is customized training available?

    G. How will the change process be managed?

Tips on How to Prepare for the Exams

Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only ISQI exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your CTAL_TM_001 exam preparations and ISQI certification application, do not hesitate to visit our Vcedump.com to find your solutions here.