You have a customer that is building a new campus of four 3-story buildings that you have just completed the site survey for. The customer is interested in the amount of rack space they will need to allocate in either the building MDF or in the data center for controllers. Each building is going to require 75 APs to support voice and data. How should the controllers be deployed to provide the least number of controllers, the highest redundancy, and the easiest management?
A. Use the distributed deployment method in each building MDF with the N + N redundancy method.When using WCS 7.0 to calibrate a floor in a facility, which two factors are common to the point and linear calibration methods? (Choose two.)
A. You must go through each collection point at a speed that isn't too fast to collect too much information nor too slow which limits the amount of information collected.An engineer is configuring an AP for a site survey. How should the transmit power be configured?
A. Set to maximum power.When designing for location services, how many APs should be heard by each location- ready AP and at what dBm signal level? (Choose two.)
A. At least 1 to 2 APs at a signal level of -67 dBm or betterRefer to the exhibit. A company requires a multi-point bridge solution with Cisco 1400 series bridges. The central bridge (B1) is set to 10 dBm, the manufacturing remote bridge (B2) is set to 20 dBm, the inventory remote bridge (B3) is set to 20 dBm, and the shop remote bridge (B4) is set to 10 dBm. What is the maximum allowed power setting for all four bridges?

The wireless survey report shows APs staggered throughout a facility, with several of them placed right on the exterior walls. Other APs are located right at building corners and major turns in the structure layout. Assuming all survey locations are optimized with a minimum of -67 RSSI at cell edges with 20% overlapping cells, for what purpose can this survey model be used?
A. location based services and BYOD preparationWhen discussing a WLAN site survey project with a customer, which four things do you need to know about the scope of the project before starting? (Choose four.)
A. Is the project funded?An engineer notes that some areas of a floor fail when using the Location Readiness Tool in Cisco WCS. What criteria must be met for a point to be considered location ready?
A. one AP in each quadrant, with three less than 70 feet awayDRAG DROP
Select and Place:

An engineer is conducting a survey for a point-to-point link with a 30 dBm transmitter and 6 dBi antenna over 2.4 GHz. If the engineer reduces the transmitter power to 28 dBm, what is the maximum antenna gain that can be used?
A. 6 dBiNowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only Cisco exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your 642-732 exam preparations and Cisco certification application, do not hesitate to visit our Vcedump.com to find your solutions here.