642-732 Exam Details

  • Exam Code
    :642-732
  • Exam Name
    :Conducting Cisco Unified Wireless Site Survey (CUWSS) v2.0
  • Certification
    :Cisco Certifications
  • Vendor
    :Cisco
  • Total Questions
    :193 Q&As
  • Last Updated
    :Dec 04, 2021

Cisco 642-732 Online Questions & Answers

  • Question 1:

    You have a customer that is building a new campus of four 3-story buildings that you have just completed the site survey for. The customer is interested in the amount of rack space they will need to allocate in either the building MDF or in the data center for controllers. Each building is going to require 75 APs to support voice and data. How should the controllers be deployed to provide the least number of controllers, the highest redundancy, and the easiest management?

    A. Use the distributed deployment method in each building MDF with the N + N redundancy method.
    B. Use the centralized deployment method in the data center with the N + N + 1 redundancy method.
    C. Use the distributed deployment method in each building MDF with the N + 1 redundancy method.
    D. Use the centralized deployment method in the data center with the N + 1 redundancy method.
    E. Use the distributed deployment method in each building MDF with the N + N +1 redundancy method.
    F. Use the centralized deployment method in the data center with the N + N redundancy method.

  • Question 2:

    When using WCS 7.0 to calibrate a floor in a facility, which two factors are common to the point and linear calibration methods? (Choose two.)

    A. You must go through each collection point at a speed that isn't too fast to collect too much information nor too slow which limits the amount of information collected.
    B. You must sample both the 802.11a/n and the 802.11b/g/n network separately.
    C. If one collection point in the linear or point collection method is missed, you have to start at the beginning again.
    D. Rotating the client is only required during the point collection process because the linear method is a slowly moving process.
    E. You will only need to combine the linear and point collection methods in special spaces like hallways.

  • Question 3:

    An engineer is configuring an AP for a site survey. How should the transmit power be configured?

    A. Set to maximum power.
    B. Set to one level below full power.
    C. Enable DTPC.
    D. Set to one level above the lowest power level.

  • Question 4:

    When designing for location services, how many APs should be heard by each location- ready AP and at what dBm signal level? (Choose two.)

    A. At least 1 to 2 APs at a signal level of -67 dBm or better
    B. No more than 3 APs at a signal level of -72 dBm or better
    C. At least 5 to 6 APs at a signal level of -75 dBm or better
    D. At least three and preferably four at a signal level of -75 dBm or better
    E. As many APs as possible at a signal level of -72 dBm or better

  • Question 5:

    Refer to the exhibit. A company requires a multi-point bridge solution with Cisco 1400 series bridges. The central bridge (B1) is set to 10 dBm, the manufacturing remote bridge (B2) is set to 20 dBm, the inventory remote bridge (B3) is set to 20 dBm, and the shop remote bridge (B4) is set to 10 dBm. What is the maximum allowed power setting for all four bridges?

    A. B1=12dBmB2=12dBmB3=12dBmB4=12dBm
    B. B1=12dBmB2=24dBmB3=24dBmB4=24dBm
    C. B1=24dBmB2=12dBmB3=12dBmB4=12dBm
    D. B1=24dBmB2=24dBmB3=24dBmB4=24dBm
    E. B1=20dBmB2=20dBmB3=20dBmB4=20dBm
    F. B1=10dBmB2=24dBmB3=24dBmB4=24dBm

  • Question 6:

    The wireless survey report shows APs staggered throughout a facility, with several of them placed right on the exterior walls. Other APs are located right at building corners and major turns in the structure layout. Assuming all survey locations are optimized with a minimum of -67 RSSI at cell edges with 20% overlapping cells, for what purpose can this survey model be used?

    A. location based services and BYOD preparation
    B. voice and data clients with video on demand
    C. streaming video with VoIP and data as an option
    D. location services, VoIP, data, and video

  • Question 7:

    When discussing a WLAN site survey project with a customer, which four things do you need to know about the scope of the project before starting? (Choose four.)

    A. Is the project funded?
    B. Internally, who or which group is driving this project?
    C. Is this a new project, an extension, or a modification to an existing WLAN?
    D. How many APs and controllers are projected to be needed?
    E. How many members of the customer IT staff will require training?
    F. Can the survey be accomplished in the time allotted?
    G. How many user groups will need to be interviewed?
    H. Will site survey engineers need to shadow user as they perform their work duties?

  • Question 8:

    An engineer notes that some areas of a floor fail when using the Location Readiness Tool in Cisco WCS. What criteria must be met for a point to be considered location ready?

    A. one AP in each quadrant, with three less than 70 feet away
    B. one AP in three quadrants, with two less than 70 feet away
    C. one AP in each quadrant, with two less than 70 feet away
    D. one AP in three quadrants, with one less than 70 feet away

  • Question 9:

    DRAG DROP

    Select and Place:

  • Question 10:

    An engineer is conducting a survey for a point-to-point link with a 30 dBm transmitter and 6 dBi antenna over 2.4 GHz. If the engineer reduces the transmitter power to 28 dBm, what is the maximum antenna gain that can be used?

    A. 6 dBi
    B. 8 dBi
    C. 9 dBi
    D. 12 dBi

Tips on How to Prepare for the Exams

Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only Cisco exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your 642-732 exam preparations and Cisco certification application, do not hesitate to visit our Vcedump.com to find your solutions here.