  • Question 21:

    An administrator is configuring Storage I/O Control. After enabling, the administrator notices high device latency and poor storage performance. Which two actions would likely reduce latency and improve functionality? (Choose two.)

    A. Set the congestion threshold to 15ms

    B. Set the congestion threshold value to 5ms

    C. Ensure that each datastore has independent spindles

    D. Ensure that each datastore uses shared spindles

  • Question 22:

    Which two statements are true regarding upgrading from a Distributed vCenter Server 5.x to vCenter Server 6.x? (Choose two.)

    A. vCenter Single Sign-on becomes part of the Platform Services Controller.

    B. vCenter Inventory Service becomes part of the Platform Services Controller.

    C. The vCenter Server service is not migrated during the upgrade process.

    D. The vSphere License Service is migrated to the new vCenter Server 6.x instance.

  • Question 23:

    When attempting to connect to a vCenter Server, an administrator observes the following at the top of the vSphere Web Client:

    Could not connect to one or more vCenter Server Systems:

    https://vCenter.corp.com:443/sdk

    What three reasons could be preventing the vSphere Web Client from communicating with this vCenter Server? (Choose three.)

    A. The vCenter Server machine is not responding via the network.

    B. An incorrect entry for this vCenter Server exists in the Single Sign-On service.

    C. The SSL certificates do not match the FQDN address for the server.

    D. The Platform Services Controller is external to this vCenter Server.

    E. The DNS entry for the vCenter Server is incorrect.

  • Question 24:

    An administrator needs to migrate a legacy physical application server to a virtual machine within a vSphere 6 cluster. As part of the conversion, the administrator must reduce the size of the virtual disks. What action should the administrator take to create a virtual machine with smaller virtual disks than the original physical server?

    A. Shut down the physical server and use VMware Converter cold cloning with volume- based cloning at the disk level.

    B. Use VMware Converter hot cloning with volume-based cloning at the block level.

    C. Shut down the physical server and use VMware Converter cold cloning with volume- based cloning at the file level.

    D. Use VMware Converter hot cloning with volume-based cloning at the file level.

  • Question 25:

    An administrator observes the following symptoms for a virtual machine:

    CPU usage is consistently above 90%

    CPU ready value is consistently above 20%.

    Application performance is impacted.

    Which two actions should the administrator take to improve the performance of this virtual machine? (Choose two.)

    A. Increase the number of vCPUs assigned to this virtual machine.

    B. Decrease the number of vCPUs assigned to this virtual machine.

    C. Verify that VMware Tools is installed on every virtual machine on the host.

    D. Increase the CPU shares assigned to the virtual machine.

  • Question 26:

    An administrator plans to use VMware Converter Standalone to convert a virtual machine to a vSphere environment. The source virtual machine has these properties:

    Running Windows 2008 R2 Contains one NTFS formatted volume During conversion, how many virtual disks can the administrator add to the destination virtual machine?

    A. 0

    B. 1

    C. 2

    D. 3

  • Question 27:

    An administrator tries to connect the vSphere 5.5 Client to an ESXi 6.x host. What will happen when this takes place?

    A. The operation will fail, since the vSphere Client is deprecated in vSphere 6.x.

    B. The operation will fail and the administrator will need to delete the client and install the 6.x version.

    C. The operation will prompt the administrator to run a script to upgrade the vSphere Client.

    D. The operation will update the vSphere Client silently in the background, then connect.

  • Question 28:

    What will occur if the .nvram file is deleted from a powered off virtual machine?

    A. The .nvram file will get created the next time the virtual machine is powered on.

    B. Restoring the file from backup is needed to allow the virtual machine to power on.

    C. The virtual machine will fail to power on and enter an Orphaned state.

    D. The virtual machine will fail to power on and enter an Inaccessible state.

  • Question 29:

    Which three ports are used by the vSphere Web Client when connecting directly to an ESXi 6.x host? (Choose three.)

    A. 443 TCP

    B. 902 TCP and UDP

    C. 903 TCP

    D. 5480 TCP

    E. 9443 TCP and UDP

  • Question 30:

    An administrator is performing a silent automatic update of VMware Tools on a Windows virtual machine. What syntax needs to be entered into the Advanced Options box?

    A. /s /v "/qn" /l "c:\Windows\filename.log"

    B. --prefix=/usr/local,/usr/lib,/usr/doc --silent

    C. --prefix=c:\Windows,c:\VMtools --silent

    D. /fs /v "/qn+" /l "c:\Windows\filename.log"

Tips on How to Prepare for the Exams

Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only VMware exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your 2V0-621D exam preparations and VMware certification application, do not hesitate to visit our Vcedump.com to find your solutions here.