What do you have to consider regarding ATP checks in SAP ECC that are triggered from customer orders?
Reveal answer details Close answer details
Correct answerB
SAP ยท C_TSCM42_67
Review the question wording, option layout, and available explanations before choosing a study plan.
|
Single choice
What do you have to consider regarding ATP checks in SAP ECC that are triggered from customer orders? Reveal answer details Close answer detailsCorrect answerB
Single choice
Which of the following master data is necessary for the creation of material reservations for production orders? Reveal answer details Close answer detailsCorrect answerA
Multiple choice
Which types of objects can be changed with Engineering Change Management (ECM)? (Choose three) Reveal answer details Close answer detailsCorrect answersA, D, E
Multiple choice
Which of the following structural elements does a process order have? (Choose three.) Reveal answer details Close answer detailsCorrect answersC, D, E
Single choice
In which scenario will the error message shown in the attached screenshot occur? Exhibit: ![]() Exhibit Reveal answer details Close answer detailsCorrect answerC
Single choice
Which of the following properties applies to multi-site planning in SAP ECC? Reveal answer details Close answer detailsCorrect answerC
Single choice
Your customer tests the firming options for planned orders in SAP ECC using a test material. Therefore, the customer sets a firming date in the stock/requirements list manually. Additionally, the customer sets a planning time fence with firming type 1 in the material master. How is the resulting firming interval specified in this scenario? Reveal answer details Close answer detailsCorrect answerB
Single choice
You want to plan a finished material using material requirements planning in an SAP ECC system. The resulting planned orders should be scheduled using basic date scheduling (not lead-time scheduling). Which of the following properties for the resulting dependent requirements applies? Reveal answer details Close answer detailsCorrect answerD
Multiple choice
In which of the following objects can you activate backflushing of components if you want to use this functionality during order confirmation? (Choose three.) Reveal answer details Close answer detailsCorrect answersA, D, E
Single choice
What is a feature of the simu-lation mode for material requirements planning in SAP ECC? Reveal answer details Close answer detailsCorrect answerA
Multiple choice
A material was planned in the context of SAP ECC material requirements planning. The MRP controller subsequently processed the material by manually converting a specific planned order into a production order. The MRP controller now accesses the current stock/requirements list and the MRP list for this material and compares these two lists. What do you have to consider for the two lists at this stage? (Choose two) Reveal answer details Close answer detailsCorrect answersA, D
Multiple choice
During a project phase, your customer raises some questions concerning parameters of the procurement type in the material master in the SAP ECC system. Which of the following procurement type properties are valid? (Choose two) Reveal answer details Close answer detailsCorrect answersA, D
Single choice
You use a planning time fence and fixing type 1. You receive a customer order with a material availability date within the planning time fence. What do you have to consider in this scenario? Reveal answer details Close answer detailsCorrect answerD
Single choice
Which of the following scheduling types can only be used in capacity planning? Reveal answer details Close answer detailsCorrect answerA
Multiple choice
In your company planning strategies are used in the SAP-ECC demand management that are based on consumption. Which of the following statements about consumption is true? (Choose two.) Reveal answer details Close answer detailsCorrect answersB, D
Multiple choice
Which of the following statements about consumption are correct? (Choose two) Reveal answer details Close answer detailsCorrect answersB, D |