During proofing of the product manual, a problem was discovered requiring 15 days additional time to effect a correction.
How can the date of availability be maintained?

Reveal answer details Close answer details
Correct answerA
AACE International · AACE-PSP
Preview real exam questions, verified answers and available explanations before choosing a study plan.
|
Single choice
During proofing of the product manual, a problem was discovered requiring 15 days additional time to effect a correction. How can the date of availability be maintained? ![]() Reveal answer details Close answer detailsCorrect answerA
Single choice
Free float is the Reveal answer details Close answer detailsCorrect answerB
Single choice
In a "crashed" schedule, which is a chain of activities that precede activity 2004? ![]() Reveal answer details Close answer detailsCorrect answerA
Single choice
Due to a testing delay, release of the product for manufacture is delayed by 5 workdays and the product manual misses its print window at the printer. Reveal answer details Close answer detailsCorrect answerC
Single choice
Determine the correct formula and date for the late finish for Activity 2002. ![]() Reveal answer details Close answer detailsCorrect answerD
Single choice
Management has determined the need to release the product 20 days earlier than planned. What tasks need to be expedited? ![]() Reveal answer details Close answer detailsCorrect answerD
Single choice
Activity 1001 started on the scheduled date but has slipped 10 days. Activity 10002 will slip 35 days. All remaining activities retain their original duration. What is the revised completion date? ![]() Reveal answer details Close answer detailsCorrect answerC
Single choice
What method would be the best way to determine the most likely as-built critical path of a project that is underway, and the schedule of which has been partially progressed? Reveal answer details Close answer detailsCorrect answerD
Single choice
Activity durations are normally estimated in an intuitive and subjective way. All of the following will improve duration accuracy EXCEPT Reveal answer details Close answer detailsCorrect answerA
Single choice
Each column must be poured in one day. Each column requires 2,000 cubic feet of concrete. The lift bucket has a capacity of 40 cubic feet. How many lifts will be required per column pour? ![]() Reveal answer details Close answer detailsCorrect answerB
Single choice
If a cost estimate assumes that 240 hours will be expended on a given activity, and the projected crew size expected to perform that activity is 5 personnel working and 8-hour workday, what is the calculated duration for the activity? Reveal answer details Close answer detailsCorrect answerB
Single choice
When reconstructing a CPM schedule electronically from a hardcopy, which of the following is NOT required to determine the critical path? Reveal answer details Close answer detailsCorrect answerC
Single choice
You are developing a detailed critical path schedule for a proposed petrochemical plant. The schedule will become a part of the project baseline document, which will be sent to the company's board of directors for its consideration. What document or resource is likely to be MOST valuable in determining the schedule's work activity durations? Reveal answer details Close answer detailsCorrect answerB
Single choice
There is only enough room for a maximum of 4 cranes to be placed on-site. ![]() Reveal answer details Close answer detailsCorrect answerA
Single choice
Which of the following will NOT affect the total float calculation of a non-resource leveled schedule? Reveal answer details Close answer detailsCorrect answerD
Single choice
Identify the late finish to develop plans and specs. ![]() Reveal answer details Close answer detailsCorrect answerA
Single choice
Which statement is true? Reveal answer details Close answer detailsCorrect answerA
Single choice
If after calculating a schedule an activity exhibits negative total float, which of the following is certain? The activity Reveal answer details Close answer detailsCorrect answerD |